Similar Projects
Birch Run Schools - Irrigation System
Infrastructure
Bidding
Birch Run, MI 48415

Stadium Drive Tank Level Control Valve Replacement
Infrastructure
Bidding
Kalamazoo, MI 49009

FY 2020 Utility Improvements Project
Post-Bid
East Lansing, MI 48823

Multiple Blocks - Simpson Memorial - Replace Water Service to Building
Post-Bid
Ann Arbor, MI 48109

Water Main Condition Assesment Services Throughout City of Detroit (CS-1909A)
Results
Detroit, MI

2020 New Water Service Installation
Results
Less than $723,588 est. value
Kalamazoo, MI

Water Service Connection and Maintenance
Term Contract
Bidding
Southfield, MI

Waterworks Fittings
Post-Bid
Wyoming, MI

Water Supply System Improvements 68th Avenue And Lincoln Street Contract No. 3
Results
Coopersville, MI

Replacement of Private Lead Service Lines at VARIOUS LOCATIONS - Contract 2021-1
Alteration
Bidding
$1,545,725 est. value
Grand Rapids, MI

WWTP Wet Weather Storage Tank
Post-Bid
Whitmore Lake, MI 48189

Salem USD Water System
Results
Salem, MI

Quaker Valley Sub Water Main Extension and Salvador Street Water Main and Sanitary Sewer
Infrastructure
Bidding
Farmington Hills, MI 48336

Multiple Blocks - Student Publications - Replace Water Service to Building Jenny Lessard
Post-Bid
Ann Arbor, MI 48109

Hawthorn Center - Replace Galvanized Piping
Results
Northville, MI 48167

Last Updated 11/03/2021 02:29 AM
Project Title

Water Service Material Investigation

Physical Address View project details and contacts
City, State (County) Chesaning, MI   (Saginaw County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of investigating two hundred twenty-two (222) water service lines throughout the Village’s distribution system. The service lines have already been selected during the grant application process. As a part of the updated Lead & Copper Rule, the Village must determine the material of each service line throughout the Village at the curb stop box (both private and public sides) and at the water service meter. Under this contract, the selected contractor will be required to hydro-excavate a pothole on each side of the curb stop box (both private and public sides) to verify the material of the service line. The pothole will then be restored to their original condition prior to hydro-excavation. Any HMA, Concrete or turf will be removed and replaced per the standard specifications laid out here within the contract documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents