Similar Projects
West End Apartments
New Construction, Infrastructure
Conception
$150,000,000 CJ est. value
Edwards, CO 81632

Roundabout Cooley Mesa Rd/Siena Lake Parkway - Town of Gypsum
Infrastructure
Conception
$1,000,000 CJ est. value
Gypsum, CO 81637

Highline Doubletree
Addition, Demolition, Build-out, Renovation, Infrastructure - 45,250 SF
Design
$13,600,000 CJ est. value
Vail, CO 81657

Edwards RiverPark
New Construction, Infrastructure - 36,500 SF
Design
$215,700,000 CJ est. value
Edwards, CO 81632

Town of Vail Fiber Loop Construction
Infrastructure
Bidding
$300,000 CJ est. value
Vail, CO 81657

East Park Improvements and North Restrooms, Harry A. Nottingham Park
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Avon, CO 81620

Midland Avenue Streetscape Project
Infrastructure
Post-Bid
Basalt, CO 81621

Dowd Junction Lift Station 4 and Force Main Replacement
New Construction, Alteration
Results
Eagle, CO

ADA Curb Ramp Improvements at Various Locations
Infrastructure
Results
$1,000,000 CJ est. value
Edwards, CO 81632

Vail Health Northstar Center
Demolition, New Construction, Infrastructure, Build-out - 170,000 SF
Construction
$5,000,000 CJ est. value
Edwards, CO 81632

Gypsum Skate Park 2023
Renovation, Infrastructure
Construction
$200,000 CJ est. value
Gypsum, CO 81637

Lionshead Place / Multi-Residential
New Construction, Infrastructure
Pending Verification
$1,100,000 CJ est. value
Vail, CO 81657

435 Eby Creek Apartments
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Eagle, CO 81631

Jules Drive and Highway 6 Roundabout or Traffic Light - Town of Gypsum
Infrastructure
Conception
$2,500,000 CJ est. value
Gypsum, CO 81637

Village Plaza Building 2 / Sushi Oka
Addition, Demolition, Infrastructure
Design
$90,000 CJ est. value
Vail, CO 81657

Last Updated 07/06/2023 10:12 AM
Project Title

Wildridge BPS, Tank, and PRV Improvements

Physical Address View project details and contacts
City, State (County) Vail, CO 81657   (Eagle County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,434,364 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 23, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** As of May 11 the project has not yet been awarded. A timeline for award has not yet been established . All work and material associated with upgrading pumps, process piping, Building components, mechanical systems, and electrical systems at three Booster pump stations (bps), venting and appurtenance improvements at four Water storage tanks, two pressure reducing vaults (prv), demolition of two Prv vaults, all civil, structural and architectural work along with site Restoration and revegetation. Bids shall be submitted on a lump sum basis with a requirement to bid an alternate addition/deduction for two alternates including eliminating installation of a permanent generator at Wildridge BPS 1 and providing temporary pumping facilities during the construction phase of the Work. Bids shall be submitted on a lump sum basis with a requirement to bid an alternate addition/deduction for two alternates including eliminating installation of a permanent generator at Wildridge BPS 1 and providing temporary pumping facilities during the construction phase of the Work. The award may be on the basis of the base bid or of the alternate bid(s). The Owner reserves the right to reject any and all bids and to waive irregularities or informalities in any bid. Each Bidder shall file with his Bid a cashier s check, or a Bid Bond, in accordance with the Instructions to Bidders 1. Wildridge BPS 1 a. Selective demolition of existing interior lights, conductor, conduit, receptacles, switches, RVSS cabinets, motor control center lineup, process piping, pumps and valves. Demoltion of interior sheathing. b. Civil site improvements including grading, landscaping, seeding, gravel roadway, concrete pavements, new tank vent, pump around connections. c. Replacement of doors, windows and interior sheathing within the building. Installation of exterior siding and infill of existing window areas. d. Installation of new pumps, piping, valves, pipe supports, coatings, tank vent, tank ladder, and other process appurtenances and disinfection of facilities during commissioning e. Installation of new electric unit heaters, intake louver and exhaust fan. f. Installation of electrical service equipment, motor drive, field instruments, general lighting and power. Installation of new permanent generator, automatic transfer switch or alternative 1 with pin and sleeve connection with manual transfer switch. 2. Wildridge BPS 2 a. Demolition of existing pumps, piping and electrical equipment. b. Civil site improvements including tree removal, grading, landscaping, seeding, fencing, asphalt roadway, new tank vent, and pump around connections. c. Installation of new hatches and exterior coatings on the existing building. d. Installation of new pumps, piping, valves, pipe supports, coatings, tank vent, tank ladder, and other process appurtenances and disinfection of facilities during commissioning. e. Installation of new electric unit heaters, intake louver and exhaust fan. f. Installation of electrical service and distribution equipment, motor drive, field instruments, general lighting and power. 3. Wildridge BPS 3 a. Demolition of existing electrical, pumps and piping systems and selective or partial demolition of building superstructure. b. Civil site improvements including grading, landscaping, seeding, gravel roadway, concrete pavement, new tank vent, and pump around connections. c. Installation of new building addition with new foundation, walls and roof structure, window replacements, door replacements, and building coatings. d. Installation of new pumps, piping, valves, pipe supports, coatings, tank vent, tank ladder, and other appurtenances and disinfection of facilities during commissioning. e. Installation of new electric unit heaters, floor drain piping, intake louver and exhaust fan equipment. f. Installation of new electrical service equipment, variable frequency drives, field instrumentation, 4. PRV Replacements a. Installation of two new pre-manufactured and pre-piped pressure reducing valve vaults with tie-ins to existing distribution system. Installation of new distribution piping, fittings, valves and appurtenances to install the new vaults. b. Demolition or abandonment of three existing pressure reducing valve vaults. c. Backfilling, compaction, and surface restoration in public right-ofway. 5. Temporary Facilities a. Maintaining drinking water service to its customers during the duration of the project is critical to the Owner. Question Deadline 04/23/2023 Questions received less than five (5) days prior to the date of opening of Bids will not be answered. All questions about the meaning or intent of the Contract Documents are to be submitted to Owner and engineer in writing or email.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents