Similar Projects
A-1 and A-2 Seal Coat Program
Infrastructure
Bidding
$300,000 est. value
Westville, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Pavement Management Services
Infrastructure
Post-Bid
Danville, IL

Stabilization of Dangerous Embankments at the Kickapoo State Recreation Area (SRA) Abandoned Mine Site
Results
Oakwood, IL 61858

Crack Sealing
Results
Danville, IL

Seal Coat Treatment
Infrastructure
Post-Bid
Rossville, IL

Seal Coat
Results
Danville, IL

Seal Coat, Sidewalk Removal and Replacement, Concrete Curb and Gutter Removal and Replacement, Pavement Removal and Pavement Patching
Infrastructure
Post-Bid
Hoopeston, IL

3P Policy (Standard Overlay) Resurfacing From S Of Tiltonto S of Catlin
Results
Catlin, IL

Concrete Work and Trench Repair
Infrastructure, Alteration
Post-Bid
Danville, IL

12.963 Miles of Smart Resurfacing
Results
Hoopeston, IL

2022 Concrete Pavement Patching
Infrastructure
Post-Bid
$200,000 est. value
Danville, IL

1.36 MI of Patching on FAI 74 from L Street in Tilton to E of IL 1 in Danville
Results
Danville, Tilton, IL

3.072 Ml of Patching on FAS 331 from US 150 to Homer/Catlin Rd
Results
IL

2021 Overlay
Results
Danville, IL 61832

Reported 06/29/2022 12:00 AM
Project Title

Resurfacing the Intersections

Physical Address View project details and contacts
City, State (County) Georgetown, IL   (Vermilion County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids. Bids by Invitation.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing the intersections of Seminary St. & E. West St., Guy St. & 7th St., and Logan St. & 2nd St. as well as a 335' section of E. West St. beginning 635' east of Seminary Street. Work included is: 2" pavement surface removal, variable depth surface removal, HMA patching, clean and tack coat, 2" hot-mix asphalt resurfacing, sidewalk removal/replacement, curb and gutter removal/replacement, inlet reconstruction/removal/installation, and storm sewer removal/installation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents