Similar Projects
Stanly Facilities Master Plan
New Construction
Conception
Albemarle, NC 28001

Tate + Gate Cultural Arts Center
New Construction - 20,000 SF
Conception
Greensboro, NC 27403

Herring Hall Cosmetology Renovation
Renovation - 5,960 SF
Design
$1,200,000 est. value
Wilkesboro, NC 28697

NCCU Collaborative Research and Learning Center
New Construction - 5,000 SF
Design
$3,000,000 est. value
Durham, NC

Edgecombe Community College Cosmetic Arts Office Renovation
Renovation
Bidding
$220,000 est. value
Tarboro, NC 27886

RFP Construction Manager at Risk - Dabney Hall Renovation
Renovation
Bidding
$60,000,000 est. value
Raleigh, NC 27607

Bioinformatics 4th Floor Build-Out
Build-Out
Post-Bid
$10,500,000 est. value
Charlotte, NC

Eastern Wake Site General Education Building 1 and Student Services
New Construction - 110,000 SF
Post-Bid
$49,500 est. value
NC

Building 9 ADA Restroom Renovations and Building 20 Renovations
Renovation
Results
Less than $255,209 est. value
Dublin, NC 28332

William T Sinclair Building Welding Classroom 2
Renovation
Results
$225,000 est. value
Thomasville, NC

ECU Life Sciences and Biotechnology Building
Construction
Less than $76,000,000 est. value
Greenville, NC 27834

Renovations to the 7th and 8th Floors of the UNC Neurosciences Research Building (NRB), UNC-CH School of Medicine
Renovation
Construction
Chapel Hill, NC 27514

Wilson Center Multipurpose Addition
Renovation, Addition - 4,000 SF
Design
Wilmington, NC 28401

Renovation Of Biology Lab - Transylvania County Campus- Straus Building
Renovation
Post-Bid
Brevard, NC 28712

Western Union County Center for Entrepreneurship
New Construction - 17,000 SF
Results
Less than $6,200,000 est. value
Polkton, NC 28135

Reported 05/25/2022 12:00 AM
Project Title

RFQ Contractor - UNC Charlotte Popp Martin Student Dining Renovation (Food Service Equipment)

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28213   (Mecklenburg County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a mixed-use development in Charlotte, North Carolina. Completed plans call for the renovation of a educational facility. The Whiting-Turner Contracting Company is the Construction Manager for UNC Charlotte Popp Martin Student Dining Renovation. Whiting-Turner is seeking to pre-qualify subcontractors at this time for Food Service Equipment The scope of work for this prequalification is to furnish and install specified kitchen equipment to University of North Carolina at Charlotte campus. The procurement process will follow the State Construction process. The project designer is Moseley Architects Contractors/Vendors are invited to pre-qualify for the following trade package: 11A Food Service Equipment Note: The General Trades Package will be responsible for scopes of work covered under the following construction divisions. Payment and Performance Bonds will be waived for Trade Packages under $500,000. The minimum minority participation goal for this project is 10%. Whiting-Turner invites all small, minority and woman-owned contractors and suppliers to participate in the pre-qualification process. All Pre-Qualified bidders will be required to seek Historically Underutilized Business (HUB) participation Bidders must be properly licensed under all state laws, regulations, and ordinances governing the respective trades and work to be performed. The General Statutes of the State of North Carolina applicable to license requirements, submission of bids, and award of public contracts shall be observed in the receiving of bids and awarding of contracts for thework Further information may be required in addition to this pre-qualification statement based on your response. These items may include additional financial statements, proof of applicable licenses, certification status, safety program/policy, additional project experience, and or certificates of insurance. Completing this statement does not guarantee pre- qualification. The CM and Owner reserve the right to reject any or all pre-qualifications. This project shall include all goals and objectives of the Owner. For further information or questions, contact Whiting-Turner at 704-595-9588.

Details

College/University, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents