Similar Projects
1120 & 1130 N State
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$50,000,000 CJ est. value
Chicago, IL 60610

1120 & 1130 N State
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$50,000,000 CJ est. value
Chicago, IL 60610

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

2022 Sidewalk and Concrete Maintenance
Results
Palatine, IL 60067

The Fields Development
Addition, New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Chicago, IL 60647

Lake Street Office
New Construction, Infrastructure - 67,600 SF
Construction
$16,600,000 CJ est. value
Chicago, IL 60607

Dialysis Care Center Western
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chicago, IL 60620

Halsted Street Mixed-Use Development
New Construction, Infrastructure - 4,000 SF
Pending Verification
$2,000,000 CJ est. value
Chicago, IL 60614

Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

Asphalt Parking Lot Removal & Replacement
Demolition, Alteration
Post-Bid
$300,000 est. value
Lansing, Tinley Park, IL 60438

Street Resurfacing
Results
Park Ridge, IL

St. Alexius Medical Center Addition
Addition, Infrastructure, Renovation - 29,000 SF
Construction
$14,000,000 CJ est. value
Hoffman Estates, IL 60169

North Rush Street Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,900,000 CJ est. value
Chicago, IL 60611

Last Updated 02/14/2024 07:32 AM
Project Title

Bedford Park 65th Street Improvements

Physical Address View project details and contacts
City, State (County) Chicago, IL 60638   (Cook County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

65th Street Improvements, Major Avenue to Linder Avenue - The project consists of roadway widening and resurfacing, including the installation of a right turn lane with barrier medians. The work consists of hot-mix asphalt paving, P.C.C. base course widening, combination curb and gutter removal and installation, sidewalk removal and installation, earthworks, granular material installation, ADA ramp installation, temporary traffic signal installation and permanent traffic signals installation, temporary and permanent traffic signal interconnect, street lighting, underground conduit installation, drainage structure installation, pavement markings, landscape restoration as well as other related work as shown on the plans and as described herein. Site Address: 6456 S Central Ave City: Chicago County: Cook State/Province: IL Pre-Qualification: Yes Notifications to the Village of Bedford Park and Gewalt Hamilton Associates, Inc. shall be made at least two (2) working days prior to the commencement of work.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents