Similar Projects
Ford Career-Technical Center Addition and Remodeling Project
Renovation, Addition
Post-Bid
Westland, MI

Additions and Renovations to Trenton High School
Renovation, Addition
Post-Bid
Trenton, MI

Clarenceville Schools: Bathroom Renovations
Results
Livonia, MI

Board Office New Bathroom Construction 2019
New Construction
Results
Lincoln Park, MI

BP 6 District Wide Renovations
Post-Bid
Brownstown, Gibraltar, Rockwood, Trenton, Woodhaven, MI 48173

Miscellaneous Renovations - Bid Package 21
Results
Plymouth, MI

Wayne Memorial High School Addition and Remodeling Project
Renovation, Addition
Post-Bid
Westland, MI

High School And Middle School Toilet Room Renovation
Results
Garden City, MI

2020 Interior Renovations at Meads Mill Middle School
Renovation
Post-Bid
Northville, MI 48168

Bus Loop and Parking Enhancement
Results
Romulus, MI 48174

Summer 2020 Work Phase Two Grosse Pointe Public Schools
Post-Bid
Grosse Pointe, MI

Disaster Recovery Services
Results

General Contracting
Post-Bid
Detroit, MI 48212

2021 Central Office Building Renovation
Renovation
Results
Livonia, MI 48150

Renton Middle School & Kindergarten Building Phase 2
Post-Bid
New Boston, MI

Reported 12/02/2020 12:00 AM
Project Title

Summer 2021 Work Program Brownell Middle School

Physical Address View project details and contacts
City, State (County) Grosse Pointe, MI 48236   (Wayne County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager - 11/02/20
Owner View project details and contacts
Architect View project details and contacts
Description

These Projects include the installation of a new hydronic heat hot-water system. Upgrades to the flooring, ceilings, doors and hardware, bathrooms and lighting throughout the schools.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents