Similar Projects
Mt. Hope Park North Ballfield Development and Mt. Hope Park Perimeter Pathway
New Construction, Infrastructure
Bidding
$1,983,216 CJ est. value
Grand Ledge, MI 48837

RFP - Use and Activation of Grand River Park Development
Infrastructure
Bidding
$1,000,000 CJ est. value
Lansing, MI 48917

ERPS Series 1 Projects - Bid Package 5 - Track And Pavement Resurfacing
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Eaton Rapids, MI 48827

Grand Ledge Delta Center Elementary
Addition, Demolition, Infrastructure, Renovation
Post-Bid
$3,000,000 CJ est. value
Lansing, MI 48917

RFQ Construction Manager - New State Public Health and Enviro Science Lab
New Construction, Infrastructure
Post-Bid
$220,000,000 CJ est. value
Windsor charter Township, MI 48821

Overband Crack Fill
Infrastructure
Results
$923,290 CJ est. value
Charlotte, MI 48813

Ultium 3 Battery Plant Bid Package 2 - Ultium 3 Lift Station
New Construction, Infrastructure
Results
$2,756,000 CJ est. value
Lansing, MI 48917

Operations Center Parking Lot Rehabilitation Phase 2
Infrastructure
Bidding
$300,000 CJ est. value
Windsor charter Township, MI 48821

Cement
Infrastructure
Post-Bid
$200,000 CJ est. value
Bellevue, MI 49021

ERPS Series 1 Projects - Bid Package 3 - Playground, Bleacher Replacement & Press Box Renovation
Renovation, Infrastructure
Results
$920,965 CJ est. value
Eaton Rapids, MI 48827

Hot Mix Asphalt Base Crushing, Shaping and Resurfacing, Culvert Replacements, Gravel Shoulders and Pavement Markings on Five Point Highway
Infrastructure
Bidding
$483,000 CJ est. value
Eaton Rapids, MI 48827

Ultium 3 Battery Plant Bid Package 3 - GM Pump Station Improvements
Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Lansing, MI 48917

Eaton Regional Education Service Agency (RESA) Packard Highway Campus Site Improvements
Infrastructure
Results
$478,325 CJ est. value
Charlotte, MI 48813

Campus-Wide Parking Lots Restoration 2023
Infrastructure
Bidding
$143,000 CJ est. value
Lansing, MI 48917

Erickson Power Station Ash Impoundments Closure
Infrastructure
Post-Bid
$900,000 CJ est. value
Lansing, MI 48917

Last Updated 02/13/2023 10:32 AM
Project Title

Shyft Group Manufacturing Expansion

Physical Address View project details and contacts
City, State (County) Charlotte, MI 48813   (Eaton County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes site improvements, infrastructure upgrades and addition of new equipment related to EV production at its current location. As of February 2023, the project is in development. Information regarding Architect and General Contractor is unavailable. Construction start is undetermined. *

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents