Similar Projects
Landscaping and Snow Removal Maintenance Services
Term Contract
Post-Bid
White Plains, NY 10601

Emergency Snow Removal Standby Services
Term Contract
Post-Bid
Yonkers, NY 10701

Removal and Disposal of Dewatered Sewage Sludge from the New Rochelle WRRF
Term Contract
Results
New Rochelle, NY

Removal of City Owned Trees, Boles and Stumps
Post-Bid
New Rochelle, NY 10801

Refuse/Waste/Recycling Removal Services
Post-Bid
Thornwood, NY 10594

Removal and Disposal of Dewatered Sewage Sludge
Post-Bid
New Rochelle, NY 10800

Recycling and Trash Removal Services
Term Contract
Post-Bid
White Plains, NY 10601

Treated Lumber
Post-Bid
NY

Gedney Way Recycling Facility Mixed Debris Removal
Post-Bid
White Plains, NY 10605

Removal and Disposal of Tree Stumps and Logs
Post-Bid
Yorktown Heights, NY 10598

District-Wide Refuse Removal and Recycling Services
Post-Bid
Rye, NY

Removal of Pool Backwash
Term Contract
Post-Bid
NY 10567

Hauling of Liquid Waste from the Water Filtration Plant
Term Contract
Post-Bid
Bedford Hills, NY

Municipal Solid Waste and Recycling Services
Term Contract
Post-Bid
NY

Gedney Way Recycling Facility Mixed Debris Removal
Infrastructure
Post-Bid
White Plains, NY

Reported 02/19/2022 12:00 AM
Project Title

Pick-up, Removal and Lawful Disposal of Asphalt, Concrete, Rock, Brick, and Dirt Debris

Physical Address View project details and contacts
City, State (County) Yonkers, NY 10703   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To provide for the pick-up, removal and lawful disposal of asphalt, concrete, rock, brick, and dirt debris from the following locations: Department of Public Works Organic Yard – 610 Nepperhan Avenue, Yonkers, NY 10701, St. Casmir’s Lot – 59 St. Casmir’s Avenue, Yonkers NY 10701, EJ Murray Skating Center – 348 Tuckahoe Road, Yonkers NY 10710. *Locations may be added, removed, or altered, if required. This contract will be for a 12-month period and may be extended by mutual consent for an additional 12-month period, at the same unit prices, discounts, terms and conditions, and delivery requirements as the original contract. 1. Pick-up, removal, and lawful disposal of rock and dirt debris from all three (3) locations. The Contractor shall pick-up a minimum of twice per week approximately 400 tons per week. 2. Pick-up, removal, and lawful disposal of source separated concrete, asphalt, and brick located at the St. Casimir’s Lot location. The Contractor shall pick-up once per week at a minimum of approximately 150 tons per week.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents