Reported 03/11/2021 12:00 AM
Project Title

F.O.B. Co./Twp. Yard: Var. Pipe Culverts, Connect Bands, End Sections

Physical Address View project details and contacts
City, State (County) IL   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

 f.o.b. Co./Twp. Yard: Var. Pipe Culverts, Connect Bands, End Sections f.o.b. Co. Yard: Var. Culvert Liners Var. Pipe Culverts Anywhere In County: 255 Ton Bit. Matl`s. Sc (Hfrs-2p) 1,010 Ton Bit. Matl`s. Sc (Hfe-90) f.o.b. @ Quarry: 7,435 Ton Seal Coat Agg. (Ca-16) Cr. Limestone 14,680 Ton Hma Sc, Il 9.5 215 Ton Upm Cold Patch 7,500 Ton Road Stone (Ca-6) 250 Ton Conglomerate Dq Rap 300 Ton Rip Rap #400 200 Ton Ag Lime 2,000 Ton Fine Agg. (Sand) 4,000 Ton Ice Control Chips (Ca-16) 5 Ton Mastic One f.o.b. Co. Yard: Var. Traffic Control Var. Flashing Lights Var. Posts/Hardware Var. Signs

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents