Similar Projects
Boilers Replacement Building C And D
Bidding
Marietta, GA 30060

LK Moss HVAC Replacement
Bidding
Buena Vista, GA 31803

HVAC Coil Cleaning
Post-Bid
Atlanta, GA

HVAC Maintenance and Repair Services
Post-Bid
Atlanta, GA 30303

HVAC Service to Include Repair and Maintenance
Term Contract
Results
Powder Springs, GA 30127

Shallowford Falls Elementary School Kitchen Hood and HVAC Renovations
Results
Less than $303,000 est. value
Marietta, GA 30062

Kitchen HVAC Renovations
Post-Bid
Sandy Plains, GA 30075

Lassiter/Sprayberry HS HVAC Improvement Chiller Replacement
Results
Less than $1,479,935 est. value
Marietta, GA 30060

Hydraulic Cylinder, Components, Pump Repairs, Hose Fabrication
Post-Bid
Atlanta, GA

Addison Elementary Energy Recovery Unit
Addition
Results
Less than $36,388 est. value
Kennesaw, GA 30152

HVAC Filtration Systems Upgrades
Post-Bid
Austell, GA 30106

Addison Elementary VRF Heat Recovery System
Results
Less than $33,370 est. value
Kennesaw, GA 30152

HVAC and Mechanical Products
Term Contract
Post-Bid

Addison Elementary Rooftop Units
Results
Less than $81,715 est. value
Kennesaw, GA 30152

Chiller and Cooling Tower Maintenance Service
Term Contract
Post-Bid
Marietta, GA 30060

Last Updated 02/04/2021 03:08 PM
Project Title

Addison Elementary School HVAC Modifications 2021

Physical Address View project details and contacts
City, State (County) Marietta, GA 30066   (Cobb County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of, but is not limited to, renovations of the existing HVAC systems. Included are demolition, acoustical tile & grid replacement, painting, mechanical, electrical, and other scope of work as indicated in the Contract Documents. Also, included will be the completion of the new Mechanical Room Addition. Work will include the demolition of the existing RTU’s currently serving the classrooms along the three corridors and the installation of a cooling tower to be connected to new Water Source Heat Pumps and Energy Recovery Units serving these same classrooms. The work will also include whatever relocation and reconnection of existing utilities or other construction elements required to install the new Water Source Heat Pumps.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection.
Division 09 - Finishes.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents