Similar Projects
Last Updated | 03/20/2019 01:27 AM |
Project Title | Scheduled and Emergency Guardrail Repairs and Upgrades at Various Locations |
Physical Address | View project details and contacts |
City, State (County) | (Berkshire, Franklin, Hampden, Hampshire, Worcester Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $468,200 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | "1.000","Cy","Unclassified Excavation","120.1" "2.000","Cy","Class b Rock Excavation","144." "5.000","Cy","Gravel Borrow","151." "1.000","Ton","Disposal Of Treated Wood Products","184.1" "150.000","Hr","End Treatment Repair","600.1" "2.000","Ea","Special Base Anchor","602.02" "2.000","Ea","Guardrail Post - Modified Installation","602.3" "50.000","Ea","w Beam Highway Guard Panel - Curved","604.03" "2.000","Ea","Thrie Beam Guard Panel - Curved","604.13" "2000.000","Ft","Steel w Beam Highway Guard (Single Faced)","620.1" "200.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "200.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "650.000","Ft","Steel w Beam Highway Guard - Curved (Single Faced)","620.3" "50.000","Ft","Guardrail - Curved, Tl-2 (Single Faced)","620.32" "50.000","Ft","Guardrail - Curved, Tl-3 (Single Faced)","620.33" "1.000","Ea","Steel w Beam Highway Guard Buried End (Single Faced)","620.4" "50.000","Ft","Guardrail, Tl-2 (Double Faced)","621.12" "50.000","Ft","Guardrail, Tl-3 (Double Faced)","621.13" "50.000","Ft","Guardrail - Curved, Tl-2 (Double Faced)","621.32" "50.000","Ft","Guardrail - Curved, Tl-3 (Double Faced)","621.33" "100.000","Ft","Steel w Beam Highway Guard (Single Faced/Wood Posts)","622.1" "40.000","Ft","Steel w Beam Highway Guard - Curved (Single Faced/Wood Posts)","622.3" "1.000","Ea","Steel w Beam Highway Guard Buried End (Single Faced/Wood Posts)","622.4" "150.000","Ft","Steel Thrie Beam Highway Guard (Single Faced)","623.1" "6.000","Ft","Steel Thrie Beam Highway Guard - Curved (Single Faced)","623.3" "25.000","Ea","Trailing Anchorage","627.1" "10.000","Ea","Steel Thrie Beam Terminal Section (Single Faced)","627.3" "3.000","Ea","Steel Highway Guard Transition Beam","627.6" "1.000","Ea","Guardrail End Treatment, Tl-2 (Double Faced)","627.72" "1.000","Ea","Guardrail End Treatment, Tl-3 (Double Faced)","627.73" "24.000","Ea","Steel Beam Highway Guard Tangent End Treatment","627.8" "1.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "1.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "24.000","Ea","Steel Beam Highway Guard Flared End Treatment","627.9" "1.000","Ea","Guardrail Flared End Treatment, Tl-2","627.92" "1.000","Ea","Guardrail Flared End Treatment, Tl-3","627.93" "1.000","Ea","Leading End For Steel Beam Highway Guard At Bridge","628.1" "1.000","Ea","Trailing End For Steel Beam Highway Guard At Bridge","628.11" "3.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "1.000","Ea","Transition To Rigid Barrier (Single Faced)","628.22" "1.000","Ea","Transition To Rigid Barrier (Double Faced)","628.23" "1.000","Ea","Transition To Bridge Rail","628.24" "2.000","Ea","Transition To Thrie Beam","628.25" "1500.000","Ft","Highway Guard Removed And Reset","630." "40.000","Ea","Guardrail Post - Wood","632.1" "7.000","Ea","Guardrail Offset Block - Thrie Beam","633.1" "20.000","Ea","w Beam Guard Panel","634." "100.000","Ft","72 Inch Chain Link Fence (Spring Tension Wire) Vinyl Coated (Line Post Option)","644.172" "100.000","Ft","96 Inch Chain Link Fence (Spring Tension Wire) Vinyl Coated (Line Post Option)","644.196" "100.000","Ft","72 Inch Chain Link Fence (Pipe Top Rail) w/Barb (Line Post Option)","647.072" "100.000","Ft","72 Inch Chain Link Gate With Gate Posts And Barbed Wire","651.072" "6.000","Ea","72 Inch Chain Link Fence End Post","652.072" "4.000","Ea","96 Inch Chain Link Fence End Post","652.096" "2.000","Ea","72 Inch Chain Link Fence Corner Or Intermediate Brace Post","653.072" "10.000","Ft","72 Inch Chain Link Fence Fabric","654.072" "100.000","Ft","Chain Link Fence Removed And Stacked","665." "50.000","Ft","Chain Link Fence Removed And Reset","666." "1.000","Ea","Chain Link Fence Gate w/Gate Posts Removed & Stacked","667." "50.000","Ft","Sedimentation Fence","697." "5.000","Ea","Emergency Response","748.1" "15.000","Ea","Bales Of Hay For Erosion Control","767.8" "100.000","Ea","Demountable Reflectorized Delineator - Guard Rail","833.5" "12.000","Ea","Delineation For Guard Rail Termini","833.7" "40.000","Hr","Roadway Flagger","850.41" "34.000","Day","Traffic Cones For Traffic Management","851.1" "260.000","Sf","Safety Signing For Traffic Management","852." "34.000","Day","Truck Mounted Attenuator","853.403" "34.000","Day","Arrow Board","856." "34.000","Day","Portable Changeable Message Sign","856.12" "660.000","Day","Reflectorized Drum","859." "1.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete For Post Foundation","901.3" | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |