Similar Projects
Twin Valley Road Improvements
Infrastructure
Bidding

2022 Street Maintenance Project
Infrastructure
Bidding
Hudson, WI 54016

Road Work Bid
Infrastructure
Post-Bid
Forest, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Parks Paving, Sealing and Striping
Infrastructure
Post-Bid
New Richmond, WI 54017

River Falls - Spring Valley, CTH CC South to STH 128; River Falls - Spring Valley, Eau Galle River Bridge, B-47-0775
Results
River Falls, Spring Valley, WI 54022

Various Construction Season Materials/Services
Infrastructure
Post-Bid
Baldwin, WI

Star Prairie - Osceola, Scl to Cth Y
Results
Osceola, Star Prairie, WI

Basketball Court Paving
Infrastructure
Post-Bid
New Richmond, WI 54017

Glenwood City - Colfax, STH 128 to STH 79, Glenwood City - Colfax, STH 25 to CTH D, Glenwood City - Colfax, STH 79 to STH 25
Results
Colfax, Glenwood City, WI 54013

Glen Hills Park Group Camp Mound System
New Construction
Post-Bid
Glenwood City, WI 54013

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Perch Lake Road Improvements
Results
Hudson, WI 54016

Last Updated 03/23/2022 01:39 PM
Project Title

Blue Spruce Lane Improvements

Physical Address View project details and contacts
City, State (County) Somerset, WI   (Saint Croix County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: 185 LF of 8-inch HDPE watermain H.D.D., 150 LF of casing pipe jacking, 200 LF of Cl. 52 watermain, 190 LF of 1-inch copper water service, 1 EA sanitary manhole, 250 ton of asphaltic concrete pavement, and all ancillary items necessary to complete the work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents