Similar Projects
Last Updated | 09/26/2022 09:39 AM |
Project Title | Pipeline Joint Repair and Adams Avenue Flow Diversion Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Temecula, CA 92590 (Riverside County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $681,777 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work involves performing all work and furnishing all labor, materials, and equipment, as provided by the Contract Documents, for a completed Work of Improvement, as follows: Pipeline Joint Repair [project No. Pg205] and Adams Avenue Flow Diversion Rehabilitation [project No. Pg209] The Project Includes the Rehabilitation of Existing Sanitary Sewer Facilities at Two (2) Separate Locations, Including the Demolition of One (1) Existing 60-inch Diameter Sewer Manhole and Gravity Sewer; the Installation of One (1) 72-inch Diameter Pre-cast Sewer Manhole, Owner-furnished 12 Inch Pinch Valve, and Electric Actuator; the Installation of Ductile Iron Gravity Sewer Main; the Rehabilitation of an Existing 24-inch Diameter Gravity Sewer Main Using Cured-in-place Pipe (Cipp); the Lining and Rehabilitation of Two (2) Existing Sewer Manholes; and All Associated Work. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1,000 per calendar day Start/Delivery Date Estimated NTP September 9, 2022 Project Duration 240 calendar days Q&A Deadline 08/09/2022 4:48 PM (PDT) |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |