Similar Projects
Chinle Strip Center
New Construction, Infrastructure - 13,000 SF
Design
$3,400,000 CJ est. value
Chinle, AZ 86503

Chinle Strip Center
New Construction, Infrastructure - 13,000 SF
Design
$3,400,000 CJ est. value
Chinle, AZ 86503

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

N112 Culvert Installation
Infrastructure
Post-Bid
Fort Defiance, AZ

Shoulder Widening
Infrastructure
Results
$17,066,000 est. value
AZ

Pavement Preservation
Infrastructure
Results
$7,195,000 est. value
AZ

RFP Engineering - Electrical Construction Services - Pole Structure Replacements and Powerline Construction
Infrastructure
Pending Verification
$500,000 CJ est. value
Fort Defiance, AZ 86504

RFP Engineering - Electrical Construction Services - Pole Structure Replacements and Powerline Construction
Infrastructure
Pending Verification
$500,000 CJ est. value
Fort Defiance, AZ 86504

Chinle Lumber Yard
New Construction, Infrastructure - 6,100 SF
Design
$800,000 CJ est. value
Chinle, AZ 86503

Road Maintenance Project for 3.5 Miles: Single and Double Coarse Chip Seals With Culvert Replacements
Infrastructure
Post-Bid
Window Rock, AZ

Z--Expedited Repair of 8-Inch Sewer Main Line
Term Contract
Results
Pinon, AZ 86520

Church Chicken Franchise
New Construction, Infrastructure - 2,750 SF
Design
$600,000 CJ est. value
Chinle, AZ 86503

Route N16-Inscription House
Infrastructure
Post-Bid
Window Rock, AZ

Last Updated 03/08/2023 11:05 PM
Project Title

Eagar to Crescent Lake

Physical Address View project details and contacts
City, State (County) Greer, AZ 85927   (Apache County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $13,354,920 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Mar 06, 2023 Contract Award Number: 6982AF23C000020 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: FTDPQUMAHDQ3 Contractor Awarded Name: HATCH CONSTRUCTION & PAVING INC Contractor Awarded Address: Taylor, AZ 85939 USA Base and All Options Value (Total Contract Value): $13,354,920.00 Request for Technical Information - Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3). NOTICE TO BIDDERS A-iii TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON December 1, 2022 Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at https://sam.gov Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data. For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive. FAX Number to submit modifications to bids for this project is (720) 963-3360 Email Address to submit modifications to bids for this project is cflcontracts@dot.gov Schedule at least 2 non-work days out of every 14 calendar days. The selected non-work days do not need to be consecutive, but they must be scheduled. Notify the CO at least 2 weeks before changing the scheduled days off. The CO may grant written approval for exemptions to scheduled days off for specific project operations and for periods of limited duration. Add the following: E-13 AZ FLAP 261(1) Eagar to Crescent Lake The CO will issue a Notice to Proceed before commencement of any work. Do not perform ground disturbing activities prior to April 5th, 2023. The contract completion date is November 22, 2023. Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Item 13A. Item 9: FOR GENERAL INFORMATION: E-mail us at CFLContracts@dot.gov. FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov . Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in Subsection 108.01 of the SCRs. Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15 Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-14. Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee (Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP14. All bid guarantees must have original signatures with original corporate seals. Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to https://sam.gov. Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the FP-14. ESTIMATED PRICE: The price range of the project work is between $10,000,000 and $20,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. HFLCEO220351PR

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents