Project Title

Waterton Road Extension Phase 2 Project

Physical Address View project details and contacts
City, State (County) Castle Rock, CO   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,952,852
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of approximately 2.5 miles of new two and four lane roadway including 2 three span bridges at the Willow Creek crossing. The Project includes the following major items and approximate quantities: " 38,166 CY Aggregate Base Course " 48,479 TON - HMA " 7,988 LF Reinforced Concrete Pipe (18 - 42 ) " 60 EACH Inlets (Type R, C & D) " 54 EACH Manholes (Slab Base & Box Base) " 35.367 LF Curb & Gutter Type 2 " 22,962 LF Trench Drain " 34,768 LF PVC Conduit (2 - 6 ) " 1,480 LF Steel Piling " 324 LF Drilled Shaft (48 ) " 1,618 CY Concrete Class D " 370,768 LBS Reinforcing Steel " 1,913 LF Prestressed Concrete I (CBT45).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents