Similar Projects
PSF Lighting Upgrades
Infrastructure
Sub-Bidding
$135,000 CJ est. value
Minneapolis, MN 55415

Minneapolis Public Schools High School Pressbox OSP Fiber Connectivity
Renovation
Sub-Bidding
$630,000 CJ est. value
Minneapolis, MN 55415

LED Lighting Supplies
Infrastructure
Post-Bid

Traffic Signal Cable
Infrastructure
Post-Bid
Minneapolis, MN

2022 Osseo Senior High East Wing LTFM
Alteration
Results
$4,000,000 est. value
Osseo, MN 55369

50th Street West and Broadway Street Northeast Signal - Pedestrian Improvements and Fiber
Alteration
Results
$175,000 est. value
Minneapolis, MN 55467

Eden Prairie High School PAC Lighting Upgrades
Renovation
Sub-Bidding
$200,000 CJ est. value
Eden Prairie, MN 55346

Minneapolis Solar
Alteration
Post-Bid
Minneapolis, MN

Schneider Theatre Lighting System
Alteration
Results
Bloomington, MN 55431

2022 District Wide LED Lighting
Alteration
Post-Bid
Brooklyn Park, MN 55429

2022 Electrical Infrastructure Program P13
Alteration
Results
MN

Solar Power System Design and Installation Master
New Construction, Infrastructure
Post-Bid

Electrical Switchgear Replacements (STH)
Alteration
Results
Minneapolis, MN

Maple Grove HS Auditorium Lighting Replacement
Alteration
Post-Bid
Maple Grove, MN 55369

2022 Lucy Laney Lighting Upgrades
Alteration
Results
Minneapolis, MN 55412

Last Updated 05/08/2023 03:10 PM
Project Title

2023 Emergency Power Upgrades

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55415   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,507,597 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project includes the replacement of ATS's on Concourse A, Concourse B, Concourse C, Red Parking Ramp, C/G Connector Bridge and Light Rail Platform including the associated generator system network upgrades related to the transfer switches being replaced. Additional work includes adding a redundant power source to the generator building, upgrading emergency power meters, and upgrading the remaining multi-mode fiber equipment in the generator fiber network to single mode fiber connections. Additional work includes traffic control, concrete equipment pads, and painting at floors and door hardware replacement. At Terminal 2, a UPS system will be upgraded and replaced. Mechanical scope includes the uninstallation and reinstallation of an exhaust fan and associated controls. Additional mechanical work includes the building of a filter rack, removal of an abandoned plumbing fixture, monitoring of an existing fire damper, and reworking the Fire Protection sprinkler coverage in affected areas Each bid shall be accompanied by a Bid Security in the form of a certified check made payable to the MAC in the amount of not less than five percent (5%) of the total bid,

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents