Similar Projects
Challenger School
New Construction
Conception
Leander, TX 78641

Rosedale and New Northeast Middle School Design Build
New Construction
Design
Austin, TX

LBJ Early College High School
Renovation - 56,258 SF
Design
$14,500,000 est. value
Austin, TX 78724

Renovations at Pickle Elementary School
Renovation
Bidding
Less than $1,267,452 est. value
Austin, TX 78752

Multipurpose Facilities
New Construction
Bidding
Less than $8,500,000 est. value
Manor, TX 78653

Construction Manager at Risk (CMAR) for Westwood High School Master Plan Phase 4a and 4b B003G009A and B003G009B
Post-Bid
Less than $29,000,000 est. value
Austin, TX 78750

AISD Eastside Memorial ECHS High School
New Construction - 169,475 SF
Post-Bid
Austin, TX 78702

Rosedale School Modernization
Renovation - 74,550 SF
Results
Less than $27,625,400 est. value
Austin, TX 73301

Construction of Middle School 7 and Elementary School 22
New Construction - 313,165 SF
Results
Less than $82,400,000 est. value
Pflugerville, TX

AISD Eastside Memorial ECIHS High School
New Construction - 169,475 SF
Construction
Austin, TX 78721

Modernization at Norman Elementary School
Renovation, Addition
Construction
Less than $25,000,000 est. value
Austin, TX 73301

Construction Manager-at-Risk for Construction of School Campus
New Construction
Design
Austin, TX 78721

Hill Elementary School Phase 1 Modernization
New Construction, Addition - 20,000 SF
Post-Bid
Less than $17,783,000 est. value
Austin, TX 73301

2019 Building Program
Renovation, Addition
Results
Leander, TX 78641

Casis Elementary School
Renovation, Demolition - 94,718 SF
Construction
Austin, TX 78703

Last Updated 06/17/2021 11:19 AM
Project Title

Phase I Construction Manager at Risk BASIS Texas Charter Schools - BASIS Benbrook Primary Campus and BASIS Pflugerville Campus

Physical Address View project details and contacts
City, State (County) Pflugerville, TX   (Travis County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Construction Management - CM at Risk.
Project Status Contract Award
Bids Due View project details and contacts
Estimated Value $11,000,000 to $22,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

BASIS Texas Charter Schools invites qualified firms to submit CM At-Risk proposals for construction services for two new BASIS Texas Charter Schools located in Benbrook, TX and Pflugerville, TX. The BASIS Benbrook Primary Campus Project consists of a new ground up K-5 single story building of approx. 42,633sf and related site work on a greenfield site that is approx. 6.6 gross acres on Vista Way in Benbrook, TX. The school will include classrooms, admin spaces, (2) multi-purpose rooms, an indoor playroom, an exercise room and an ICC500 storm shelter of approx. 5,960sf. The estimated cost of construction is $11 million dollars. The BASIS Pflugerville Campus Project includes construction of a new ground up K-12 two story building. The project will be built in two phases. This RFP is for PHASE I ONLY. Phase I will be grades K-8 and approx. 41,345sf. Phase I will include an elevator, stairs, classrooms, admin spaces, a multi-purpose room, an exercise room and related site work on a greenfield site that is approx. 11.5 acre on Wells Branch Parkway in Pflugerville, TX. The estimated cost of construction is $11 million dollars.

Details

,, 83,978 SF - 1 Elementary School, 1 Story Above Grade, 42,633 SF New Construction, 1 Middle/Senior High School, 2 Stories Above Grade, 41,345 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents