Similar Projects
SR 410/0.75 miles W of East Winter Gate - Culvert Lining
Infrastructure
Conception
$450,000 CJ est. value
Enumclaw, WA 98022

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

601 Market Street Mixed-Use Building
Demolition, New Construction, Infrastructure - 5,279 SF
Design
$1,000,000 CJ est. value
Kirkland, WA 98033

The Seattle Public Library Green Lake Branch URM Seismic Upgrade and Renovation
LEED Certification, Renovation, Infrastructure
Bidding
$4,627,000 CJ est. value
Seattle, WA 98115

Sunset Highway and 77th Avenue Southeast Intersection Improvements
Infrastructure
Bidding
$1,300,000 CJ est. value
Mercer Island, WA 98040

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Harbor Island Dock Demolition
Demolition
Results
$4,350,636 est. value
Seattle, WA 98134

Rt 44 Transit Plus Multimodal Corridor
Alteration
Results
Seattle, WA

Renton High School Student Store Improvements
Renovation, Infrastructure
Construction
$557,000 CJ est. value
Renton, WA 98057

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

Western Avenue Apartment Building
Demolition, New Construction, Infrastructure
Pending Verification
$56,600,000 CJ est. value
Seattle, WA 98121

Bioretention and Water Quality Treatment at 126th Ave NE
Infrastructure
Design
$214,581 CJ est. value
Kirkland, WA 98033

SR 900 / 68th Ave S Vicinity - Pedestrian Safety - Phase 2
Infrastructure
Bidding
$750,000 CJ est. value
Bryn Mawr-Skyway, WA 98178

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

Last Updated 10/10/2022 04:07 AM
Project Title

SR 202/Evans Creek - Fish Passage

Physical Address View project details and contacts
City, State (County) Redmond, WA 98053   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $8,512,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove the existing fish passage barrier and replace it with a fish passable structure. As of October 10, 2022, this project is in Design status. Preliminary engineering has begun and environmental design is expected to be complete in the First quarter of 2022. The contract advertisement is expected in Fourth quarter of 2022 and construction is anticipated to be operationally complete in the Fourth quarter of 2023. WSDOT - SR 202/Evans Creek - Fish Passage *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents