Nampa Wastewater Treatment Plant Phase 3 - City of Nampa
Renovation, Infrastructure
Conception
$200,000,000 CJ est. value
Nampa, ID 83687

Lander Street Secondary Capacity - City Of Boise
Renovation
Conception
$42,504,000 CJ est. value
Boise, ID 83703

Phosphorous Reduction - City of Coeur D Alene
Renovation
Design
$688,000 CJ est. value
Coeur D Alene, ID 83814

Well 26 Water Treatment Facility
Infrastructure
Bidding
$410,000 CJ est. value
Meridian, ID 83646

Wastewater Lagoon Modular Floating Cover
Infrastructure
Bidding
$350,000 CJ est. value
Eagle, ID 83616

WWTP Phase II - Group F
Renovation, Infrastructure
Post-Bid
$126,400,000 CJ est. value
Nampa, ID 83651

Parma Dechlorination Project
Renovation
Post-Bid
$300,000 CJ est. value
Parma, ID 83660

Waste Water Recovery Facility (WRRF) Side Stream Phosphorus Treatment Construction
New Construction
Results
$2,000,000 est. value
Meridian, ID 83646

Jerome Wastewater Treatment Plant New Headworks Building
New Construction
Results
$4,000,000 est. value
Jerome, ID 83338

Lander Street Primary Clarifiers - City of Boise
Renovation
Conception
$33,532,000 CJ est. value
Boise, ID 83703

RFQ - Professional Architectural and Engineering Services Roster for Projects - Unlimited CAT 7A
Term Contract
Post-Bid
Meridian, ID 83642

Preston WWTP(Waste Water Treatment Plant) Improvements
Renovation, Infrastructure
Results
$57,765,080 CJ est. value
Preston, ID 83263

Water Treatment Plant - 3rd Filter Bay - City of McCall
Renovation
Conception
$5,000,000 CJ est. value
McCall, ID 83638

RFQ - Professional Architectural and Engineering Services Roster for Projects - Unlimited CAT 7B
Term Contract
Post-Bid
Meridian, ID 83642

Kuna South Wastewater Treatment Plant Kuna Sewer Pond 3 Relining
Infrastructure
Results
$1,118,811 CJ est. value
Meridian, ID 83642

Last Updated 01/03/2024 09:02 AM
Project Title

Water Resource Recovery Facility (WRRF) South Junction Box Rehabilitation

Physical Address View project details and contacts
City, State (County) Meridian, ID 83642   (Ada County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $475,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Meridian will not be issuing an award The City intends to re-issue a new solicitation in the fall of 2023 Questions Due Date: Jan 22nd 2024, 12:00 PM MST Intent to Bid Due Date: Jan 31st 2024, 2:30 PM MST The City of Meridian is requesting bids for the South Junction Box Rehabilitation. This work consists of isolating and repairing an existing concrete junction box at the City of Meridian Water Resource Recovery Facility (WRRF). The Work consists of isolating and repairing an existing concrete junction box at the City of Meridian Water Resource Recovery Facility (WRRF). The Contractor is responsible for furnishing all materials, labor, and incidentals for completing the Work, including. 1. Installing sewer bypass fittings and valves on existing 16-inch and 18-inch sewer forcemains. a. City to coordinate operation and shut-down of the force mains. b. Fittings and valves shall remain in place after the project is completed. c. Valves shall be installed per ISPWC SC-406. d. Fittings and valves shall be restrained with thurst blocks per ISPWC SD403. e. Upon disassembly, Contractor to remove discharge piping from isolation valve and install leak-proof MJ cap or blind flange prior to burial. 2. Installing and testing temporary plugs and bypass pumping system per Section 02250. 3. Rehabilitate the junction box concrete structure per Section 09711. 4. Remove bypass pumping equipment and pipe plugs after the junction box rehabilitation is completed. 5. Return the site to its original condition. a. Complete all backfill requirements and restore surface to original condition (i.e. native, gravel, asphalt, etc.). b. Repair any fencing relocated during construction. c. Cleanup any materials stockpiled during construction.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents