Similar Projects
Rapidride I-Line
Alteration
Design
$60,000,000 est. value
WA

Fences And Gates Upgrade Phase II
Renovation, Infrastructure
Design
$175,000 est. value
WA

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$165,000,000 to $180,000,000 est. value
WA

Flagging and Traffic Control Services
Alteration
Bidding
WA

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Yakima County Roads & Facilities
Term Contract
Post-Bid

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Fences And Gates Upgrade Phase II Construction Inspection
Term Contract, Alteration
Design
$175,000 est. value
WA

Frontage Road Culvert Repair Phase One
Infrastructure
Bidding
Auburn, WA

Construction Management And Inspection For RapidRide I Line
Infrastructure
Post-Bid
$3,035,000 est. value
WA

Local Road Safety-Signing
Infrastructure
Results
$204,750 est. value
Kenmore, WA 98155

Jan Road Levee Setback Construction
Alteration
Design
$6,000,000 est. value
WA

Asphaltic Concrete and Related Products
Alteration
Post-Bid
WA

Storm Renewal and Replacement Project
Infrastructure
Results
$620,000 to $650,000 est. value
Auburn, WA 98092

Last Updated 01/20/2022 02:23 PM
Project Title

Eastrail North Segment Tie Removal and Interim Trail Phase 2

Physical Address View project details and contacts
City, State (County) Kirkland, Woodinville, WA   (King County)
Category(s) Heavy and Highway, Single Trades, Transportation
Sub-Category(s) Aggregates, Fencing, Highway Signs/Guardrails/Barriers, Railroad/Subway, Shoreline/Erosion/Drainage, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,280,212
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work site: from the County’s ownership in Kirkland at MP 20.4 (adjacent to the east side of 132nd Ave NE) to Redmond-Woodinville Rd NE at MP 23.7 (approximately 110 feet beyond the east edge of the roadway); and improvement of a section of the Eastrail Spur Segment from NE 124th St at MP 3.4 (adjacent to the north edge of the roadway) to NE 175th St (approximately 530 feet beyond the north edge of roadway). Removing railroad infrastructure (timber ties), restoring the railbed with the placement and compaction of 4-inches of ADA crushed gravel material on top of the railroad ballast, installation of chain link fence, placement of removable bollards and boulders at crossings, erosion control, installation of signage, and other associated work.

Details

Division 02 - Existing Conditions, Demolition, Selective Site Demolition, Railtrack Removal.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Erosion and Sedimentation Controls, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents