Similar Projects
Sanford Industrial Park
New Construction, Infrastructure
Conception
$116,200,000 CJ est. value
Sanford, NC 27330

Brick Mill Estates
New Construction, Infrastructure
Conception
$61,000,000 CJ est. value
Coats, NC 27521

Station Point
New Construction, Infrastructure
Design
$95,000,000 CJ est. value
Angier, NC 27501

PRESS - Blake Pond - Dan Ryan Builders
New Construction, Infrastructure - 30,000 SF
Design
Lillington, NC 27546

CDBG-I Sewer Rehabilitation/Replacement
Infrastructure
Bidding
$1,650,000 CJ est. value
Dunn, NC 28334

CDBG-I Sewer Rehabilitation/Replacement
Infrastructure
Bidding
$1,650,000 CJ est. value
Dunn, NC 28334

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Basketball Court Asphalt Installation
Demolition, Infrastructure
Post-Bid
$240,000 CJ est. value
Dunn, NC 28334

Harnett High School Press Box Replacement
Demolition, New Construction, Infrastructure
Results
$375,357 CJ est. value
Angier, NC 27501

Grading, Drainage, Paving, Signals, and Culverts - NC-55
Infrastructure
Results
$48,441,331 CJ est. value
Coats, NC 27521

Hwy 55 Burgers Shakes & Fries
New Construction - 2,949 SF
Construction
$500,000 to $1,000,000 CJ est. value
Dunn, NC 28334

Multiple Schools - Additions / Renovations
Addition, Demolition, Renovation, Infrastructure - 51,869 SF
Construction
$19,155,000 CJ est. value
Lillington, NC 27546

East Coast Logistics Park
New Construction, Infrastructure - 1,500,000 SF
Pending Verification
$805,000,000 CJ est. value
Dunn, NC 28334

Griffon Pointe Phase 1
New Construction, Infrastructure
Pending Verification
$36,000,000 CJ est. value
Lillington, NC 27546

Parks & Recreation - Cape Fear Shiner Park Development Phase 2 - Harnett County
New Construction, Infrastructure
Conception
$664,600 CJ est. value
Lillington, NC 27546

Last Updated 01/05/2024 09:36 AM
Project Title

North Regional WWTP Expansion

Physical Address View project details and contacts
City, State (County) Lillington, NC 27546   (Harnett County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $104,121,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the upgrade of the North WWTP from 7.5 MGD to 16.5 MGD including new and upgrade of the following systems: headworks, secondary treatment, tertiary treatment, disinfection, sludge digestion, buildings, electrical, SCADA, and controls. The project shall include all sitework, piping, fittings, valves, appurtenances, and other items required for a complete functioning project as shown on the Contract Drawings and included in the detailed specifications. *The value for this project is based on a financial range of $80,000,000 to $100,000,000. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents