HUB Goal is 11.2%.
Scope of Work;
All labor, materials, tools, equipment and incidentals necessary to construct a new water treatment plant,
including but not limited to:
1. Chemical storage and feed facilities
2. Packaged conventional water treatment plant
3. Filtered water pumps
4. Building to house the water treatment facilities
All labor, materials, tools, equipment and incidentals necessary to modify the raw water storage facilities, including but not limited to:
1. Modify and install four 10,000 gallon raw water storage tanks
2. Install one new 10,000 gallon raw water storage tank
3. Install two raw water pumps in the new treatment building
4. Install all related raw water piping, valves, controls, appurtenances
All labor, materials, tools, equipment and incidentals necessary to construct residuals holding basins, including but not limited to:
1. Two concrete-lined sludge holding basins
2. Related pumps, valves, electrical, controls, appurtenances. |
Details |
Division 02 - | Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling. | Division 03 - | Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete. | Division 04 - | Masonry, Unit Masonry. | Division 05 - | Metals, Structural Metal Framing. | Division 06 - | Wood, Plastics, and Composites, Rough Carpentry. | Division 07 - | Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers. | Division 08 - | Openings, Doors and Frames, Windows, Hardware, Glazing. | Division 09 - | Finishes, Flooring, Painting and Coating. | Division 10 - | Specialties, Signage, Safety Specialties, Lockers, Flagpoles. | Division 11 - | Equipment, Laboratory Equipment. | Division 12 - | Furnishings. | Division 13 - | Special Construction. | Division 14 - | Conveying Equipment, Lifts. | Division 21 - | Fire Suppression, Fire-Extinguishing Systems. | Division 22 - | Plumbing. | Division 23 - | Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units. | Division 26 - | Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting. | Division 27 - | Communications, Data Communications, Audio-Video Communications. | Division 28 - | Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm. | Division 31 - | Earthwork, Site Clearing, Grading, Earthwork Methods. | Division 32 - | Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses. | Division 33 - | Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities. | Division 40 - | Process Integration, Water Process Piping, Instrumentation and Control for Process Systems. | Division 41 - | Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists. | Division 44 - | Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment. | Division 46 - | Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment. |
|