Similar Projects
Service Street
New Construction, Infrastructure
Conception
Thornton, CO 80023

RFP Engineering - Second Creek Farm and Oasis Parks, Trail Fitness Stations and Shade Structures
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Commerce City, CO 80022

Westwood Subdivision Site Development
New Construction
Design
Thornton, CO 80602

Reunion Ridge Filing 2 and 3 Improvements
Infrastructure
Bidding
$11,000,000 est. value
Commerce City, CO

SH128 and US36 Bikeway Connection
Infrastructure
Bidding
$2,000,000 est. value
Westminster, CO 80003

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Gateway Center Filing 7 Phases 1 and 2
Post-Bid
Denver, CO 80239

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Design-Build Services I-70/Picadilly Interchange
Results
$37,000,000 to $43,000,000 est. value
Aurora, CO 80012

Fitness Center - Site Improvements
Infrastructure
Construction
Commerce City, CO 80022

Lake Mary Trail Paving Phase 2
Infrastructure
Bidding
$500,000 CJ est. value
Commerce City, CO 80022

PKAA Bald Mountain Mine Closure Project
Post-Bid
Denver, CO

New Park at 88th Avenue and Santa Fe Drive
Results
$1,000,000 to $1,500,000 est. value
Thornton, CO 80260

Construction Management Services 104th Street Trail Connection Project
Infrastructure
Bidding
$235,000 est. value
Westminster, CO 80020

Cleaning Maintenance And Snow Removal
Term Contract
Post-Bid
Denver, CO 80202

Last Updated 07/21/2022 03:09 PM
Project Title

2022 Asphalt and Concrete Repairs

Physical Address View project details and contacts
City, State (County) Thornton, CO 80229   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $440,000 [brand] Estimate
Plans Available from Agency's Affiliate - 06/30/22
Owner View project details and contacts
Architect View project details and contacts
Description

All questions concerning this bid shall be directed via email to: Brandon Collins, P.E. Independent District Engineering Services, LLC Heritage Todd Creek Metropolitan District Engineer 1626 Cole Boulevard, Suite 125 Lakewood, CO 80401 E-mail: brandoncollins@idesllc.com Cody Corny Independent District Engineering Services, LLC Project Engineer 1626 Cole Boulevard, Suite 125 Lakewood, CO 80401 E-mail: CodyConry@idesllc.com. The Heritage Todd Creek Metropolitan District (District) is seeking Contractors or Joint Ventures (JV) capable of Pavement and concrete repairs; crack sealing; pavement removal and replacement; concrete curb and sidewalk removal and replacement, striping, and any other elements related to paving and concrete repairs. The work shall commence on or about August 8th, 2022.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents