Similar Projects
Maintenance of Prime Power and Emergency Generators
Post-Bid
Less than $185,000 est. value
Boston, MA

Transformer Replacement at West Broadway Development
Post-Bid
Less than $120,719 est. value
Boston, MA 02111

J--Plumbing and Pipefitting Services BOA
Results
West Haven, CT - Bedford, Boston, Leeds, MA - Augusta, ME - Manchester, NH - Providence, RI - White River Jct, VT

Removal, Repair and Installation of One Emergency Generator for the Hayes Pump Station
Results
Less than $20,000 est. value
Boston, MA

Electrical Switches, Controls, Colis, Volt Meters and Other Electrical Equipment
Post-Bid
Boston, MA

Switchboard - Low Voltage
Results
Boston, MA

Plumbing Maintenance and Service
Post-Bid
Less than $1,800,000 est. value

Landside Vehicle Charging Stations Logan International Airport
Results
Less than $1,840,000 est. value
Boston, MA

Additional Security Cameras - Sub Bid
Post-Bid
$2,726,985 est. value
Boston, MA

Transfer Switches
Results
Boston, MA 02116

Purchase of One (1) 15KV Drawout Vacuum Circuit Breaker
Post-Bid
Boston, MA 02129

Provide Preventive Maintenance - General Bid
Results
Less than $7,128,837 est. value
Boston, MA 02108

Automatic Transfer Switch Replacement
Post-Bid
Less than $46,000 est. value
Roxbury, MA

Provide Preventive Maintenance - Filed Sub Bid
Results
Less than $7,128,837 est. value
Boston, MA 02108

Annual Maintenance and Service to HVAC and Plumbing systems at Various Flood Control/Navigational Facilities
Term Contract
Post-Bid
Less than $200,000 est. value
Boston, MA

Reported 08/05/2020 12:00 AM
Project Title

Toilet Room Renovations and Repairs Various Schools - Phase 1 - Sub-Bids

Physical Address View project details and contacts
City, State (County) Dorchester, MA   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Electric, Painting, Plumbing
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $925,000
Plans Available from Municipal Agency - 07/21/20
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. Work includes, but is not limited to, the following: demolition and replacement of toilet partitions; resinous flooring; painting of walls and ceilings; installation of Owner furnish toilet accessories; replacement of flush valves and faucets, and demolition and installation of new lighting.

Details

Division 09 - Finishes, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents