Similar Projects
Construction Services for City Hall Remodel
Renovation
Results
South Jordan, UT 84095

Construction Management at Risk New City Hall Stage 2
Post-Bid
$25,000,000 est. value
Murray, UT

DFCM Construction-Pre Qualified General-West Jordan Courts Remodel Clerical and Jury Areas
Renovation
Results
Less than $500,000 est. value
West Jordan, UT 84088

Generator Contractors - Richfield Courthouse Remodel, Security Upgrade
Renovation
Results
Less than $300,000 est. value
Richfield, UT 84701

DFCM Construction - Pre Qualified General-Clerical Area Remodel Layton Courts
Renovation
Construction
Less than $125,000 est. value
Layton, UT 84041

DFCM Construction Pre-Qualified General - Mtech Provo Courthouse Repurposing Remodel Phase 1B
Renovation
Results
Less than $700,000 est. value
Provo, UT 84601

Kane County Children`s Justice Center
New Construction - 1,862 SF
Construction
Kanab, UT

Convert Orem Courts Building. Todhs Space Phase II
Results
Less than $114,361 est. value
Orem, UT

Iron County Justice Center
Renovation
Construction
Cedar City, UT 84720

Ivins Replacement City Hall
New Construction
Results
Less than $3,900,000 est. value
Ivins, UT 84738

Richfield Courthouse Remodel-Probation Area
Post-Bid
Richfield, UT 84701

Cannonville Town Hall and Medical Center Addition
Addition
Post-Bid
Cannonville, UT

Reported 09/12/2019 11:04 AM
Project Title

Bountiful City Hall Remodel

Physical Address View project details and contacts
City, State (County) Bountiful, UT   (Davis County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method
Project Status Construction Commenced June 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project is intended to update the existing building interior spaces, with limited modifications to the building exterior. It is anticipated that the existing interior partition walls would be removed, along with the existing mechanical, plumbing and electrical systems. Remodeling is anticipated to include the following: 1. Minor structural upgrades (to address seismic loading). 2. Improvements for accessibility compliance in restrooms and public spaces. 3. Installation of a new roofing system. 4. Upgrades to the building envelope including interior insulation installation, door and window replacement. 5. Construction of new interior partition walls, ceilings, carpet and finishes. 6. Installation of new HVAC equipment. 7. Installation of new electrical systems including lighting, data and security systems. 8. Minor site work addressing building accessibility and general access.
Details
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents