Similar Projects
Boyette Road Reclaimed Water Main Extension
Results
$651,000 est. value
Wesley Chapel, FL 33545

Construction Services For Epperson North District Improvements Pasco County
Post-Bid
Wesley Chapel, FL

Colonial Manor Water Main Replacement Phase 4
Results
New Port Richey, FL 34655

Curley Street Water Main Relocation
Results
$291,633 est. value
San Antonio, FL 33576

Hilltop Drive Water Main Interconnect
Results
New Port Richey, FL 34654

Orangewood Lakes Water System Improvements Project
Infrastructure
Results
$510,000 est. value
New Port Richey, FL 34653

Neptune Meter R900 Automated Meter Reading System
Infrastructure
Post-Bid
Zephyrhills, FL

As Needed Pipeline Maintenance (Poly Pig Cleaning) and Repair Services
Infrastructure
Results
New Port Richey, FL

Floramar Terrace Force Main Replacement
Infrastructure
Results
$892,901 est. value
New Port Richey, FL 34652

Madison Street Reclaimed Water Main Extension
Results
$595,000 est. value
New Port Richey, FL 34652

As Needed Pipeline Repairs Contract
Term Contract
Results
Less than $1,000,000 est. value
FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Inspection of Fire Hydrants
Term Contract
Results
Less than $10,075 est. value
FL

Reclaimed Water Pipeline Extension - Phase 1
Results
$1,500,000 est. value
Zephyrhills, FL

Last Updated 01/14/2022 09:48 AM
Project Title

Fort King Water Main Extension

Physical Address View project details and contacts
City, State (County) Zephyrhills, FL 33544   (Pasco County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installing approximately 8, 500 linear feet (LF) of 12-inch polyvinylchloride (PVC) potable water piping starting at the existing terminus of the City's existing system at or near the corner of Daughtery Road and Fort King along the East County right-of-way (ROW) of Fort King continuing North to Phelps Road where it will connect into the City's existing lines. All pipelines shall be placed within existing ROW. This pipeline will connect the "high pressure zone" with the "low pressure zone" within the City. This design will also incorporate a pressure control valve assembly to allow the two systems to act concurrently without causing adverse pressure issues.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents