Similar Projects
Construction Manager Term Agreement - North Region
Term Contract
Post-Bid

Syracuse University Link Hall Room 019 Laboratory
Renovation, Addition
Construction
Syracuse, NY 13202

Construct Surge Space Illick and Moon at SUNY ESF
Results
$1,000,000 to $2,500,000 est. value
Syracuse, NY 13210

Replace Fire Extinguishing System, Chemical Storage Building
Results
Syracuse, NY 13210

Regional Job Order Contract - Syracuse Region
Renovation
Bidding
$5,000,000 to $10,000,000 est. value
NY

SU Sadler Hall Elevator Modernization 2020
Renovation
Construction
$330,400 est. value
Syracuse, NY 13210

UCH Renovate Nuclear Camera Room
Renovation
Results
Syracuse, NY 13215

Construction Manager Term Agreement - South Region
Term Contract
Post-Bid

Emergency Department Psych Renovations Community Campus
Renovation
Results
$300,000 to $700,000 est. value
Syracuse, NY

Victory Court at Syracuse University
Addition
Conception
Syracuse, NY 13210

Schine Student Center
Renovation - 55,000 SF
Design
Syracuse, NY 13204

3N Scope Reprocessing
Renovation, Demolition
Results
Syracuse, NY 13210

Renovate Marshall Hall at SUNY ESF
Renovation
Results
$30,000,000 to $35,000,000 est. value
Syracuse, NY 13210

UUH Nuclear Camera Replacement
Renovation
Post-Bid
Syracuse, NY 13210

University Hospital – 5E Sterile Processing Renovation
Renovation
Results
Syracuse, NY 13210

Last Updated 07/31/2020 08:54 AM
Project Title

4W Office Relocation

Physical Address View project details and contacts
City, State (County) Syracuse, NY 13215   (Onondaga County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upstate University Hospital to renovate two spaces on the Basement level for office space and public toilet room at the Community Campus Location. The total project includes the renovation of 2,770 gross square feet. The Base Bid portion of the project is a minor renovation indicated as Area ‘A’ on the contract documents and is 1,240 SF. Area ‘A’ renovates a vacant locker room and toilet room to become an office suite and public Women’s Toilet. Alternate 1 is indicated as Area ‘B’ on the contract documents is a gut renovation and that area of work is 1,530 sf. Area ‘B’ renovates an existing staff training suite to reconfigure the space to better suit their needs. This occupancy will not change. State University of New York also has a goal for the Work Force participation: EEO 10% WBE and EEO 10% MBE of total work force on the project.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents