Similar Projects
Waterline Replacement
Bidding
$25,000 to $100,000 est. value
WV

Right Fork Water Line Extension Project
Post-Bid
Danville, WV

Blennerhassett Condensing Water Piping Replacement
Post-Bid
Parkersburg, WV

Blandville-West Union Waterline Extension
Results
West Union, WV 26456

Water System Improvements
Results
Less than $1,921,000 est. value
Augusta, WV 26704

Water Meter Improvements - Central Boaz Public Service District
Post-Bid
Vienna, WV

Proposed Water Line Replacement - Contract 1
Results
Paden City, WV 26157

Water Infiltration Elimination and Construction at Morgantown High School
New Construction, Infrastructure
Post-Bid
Morgantown, WV

Water System Improvements
Results
Wellsburg, WV 26070

Beartown Herndon Heights Waterline Extension Project
Infrastructure
Post-Bid
Stephenson, WV

Water System Improvements
Term Contract
Results
Less than $3,648,880 est. value
Wellsburg, WV

Water Meters
Infrastructure
Post-Bid
Sistersville, WV

Main Street, Charles Street, and Commerce Street Waterline Replacement
Results
$1,745,000 est. value
Wellsburg, WV 26070

Water System Improvements Contract Nos 1, 2, and 3
Infrastructure
Post-Bid
New Cumberland, WV

Water System Improvements - Water Line Replacements and Extension - Contract 1
Results
$5,275,050 est. value
New Creek, WV 26743

Reported 07/09/2022 12:00 AM
Project Title

Waterline Replacement at Burnsville Lake

Physical Address View project details and contacts
City, State (County) Burnsville, WV 26335   (Braxton County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

replace existing potable waterline at Burnsville Dam Riffle Run Marina / Launch Area, and connecting to an existing line at the entrance to Riffle Run Campground,The existing main waterline shall be installed, tied-in to the existing system as shown clean all debris and waste resulting from construction operations and restore all surfaces, structures, ditches, roads the area is graded, smoothed, seeded, and strawed, shall be placed in the disposal area beyond the Left Fork Picnic Area.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents