Similar Projects
Last Updated 04/07/2023 12:13 PM
Project Title

Maui Community Correctional Center Renovations, Security Upgrades, and Other Improvements, Phase 1

Physical Address View project details and contacts
City, State (County) Wailuku, HI 96793   (Maui County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $3,257,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of repairs to the facility due to damage sustained from a March 11,2019 riot that occurred at Maui Community Correctional Center (MCCC). Project scope includes security infrastructure improvements and life safety enhancements that may help mitigate future riots from occurring or enhance response to emergency situations. Project scope of work within the modules includes replacement of breakaway shower curtains, HVAC system smoke arrestor exhaust fans, fire dampers, control room detention glazing, various detention doors, fire sprinkler system isolation valves, acoustic tile ceilings, and concrete spall repairs at the recreation yard floor drains. Project scope outside of the modules includes new sewer grinder/pumps within the sewer wet well and associated temporary sewer bypass, complete roof replacement, air conditioning, and ceiling repair at the gatehouse, relocation of sally port vehicle bollards, replacement of dormitory detention doors, and miscellaneous related work. Work also includes disturbance of lead containing material. The estimated construction cost is between $1 million and $2.5 million. Each Bidder shall bring their own flashlight and small tools that may be required to inspect the premises. Check with Project Coordinator. The estimated value of the public works contract is $250,000 or more and the apprenticeship agreement preference pursuant to Hawaii Revised Statutes 103-55.6 (ACT 17, SLH 2009) shall apply Please e-mail your full name (including complete middle name), date of birth, and social security number directly to the Warden at deborah.m.taylor@hawaii.gov at least seven (7) calendar days prior to entry or entry may be denied. Specify equipment, such as cameras, that you wish to bring. Applicants will receive an email notification upon completion of the background check. To be eligible to submit a Bid, the Bidder must possess a valid State of Hawaii Contractors license classification (s) B . Refer to the GENERAL NOTICE for Department of Accounting and General Services, Public Works Division Projects, published with the project specifications for additional information. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents