Similar Projects
Replace a Water Booster Pump and Fire Booster at Golden Tower
Infrastructure, Alteration
Bidding
$1,000,000 est. value
Covington, KY 41011

Contract 12 - New Water Treatment Plant and Improvements
New Construction
Bidding
$1,180,000 est. value
Sandy Hook, KY

Contract No. 2 - KY 875 Gas Main Extension
Post-Bid
Brooksville, KY

Temporary Pumping Services
Term Contract
Post-Bid
Lexington, KY

Cedar Creek WQTC - Effluent Parshall Flume Upgrade
Results
$1,000,000 to $2,000,000 est. value
Louisville, KY 40291

Vertical Pump for Glacier Run Exhibit
Results
Louisville, KY 40213

Elevated Water Storage Tank
New Construction
Construction
Paducah, KY 42002

Water and Sewer Infrastructure
Infrastructure
Pending Verification
$2,336,513 est. value
Pikeville, KY

Natural Gas Line Replacement Project
Infrastructure
Bidding
$150,000 est. value
Clay, KY

2020 Water Treatment Plant Improvements
Post-Bid
Louisa, KY

Fort Thomas Treatment Plant Basin Improvements Phase 2
Results
Fort Thomas, KY

Green River Lake Hydraulic Line Replacement
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Campbellsville, KY 42718

Crescent Hill WTP North/South Filter Building Renovation
Results
$10,000,001 to $25,000,000 est. value
Louisville, KY 40206

On and Off Road Fuel
Term Contract, Alteration
Post-Bid
KY

Stair Replacement
Renovation
Results
Nicholasville, KY 40356

Last Updated 05/19/2022 04:17 PM
Project Title

WTP Ammonia Systems and Sulfuric Acid Upgrades

Physical Address View project details and contacts
City, State (County) Frankfort, KY 40601   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Pumps and Wells, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the existing ammonia system with a new Liquid Ammonia Sulfate (LAS) system to include two bulk liquid storage tanks, containment, together with transfer/metering pumps along with miscellaneous appurtenances, controls and connections. Work also includes miscellaneous improvements to the sulfuric acid systems including a second metering pump.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents