Similar Projects
The Crossing
New Construction
Design
Saratoga Springs, UT 84045

Harvest View Park Phase 2 - Site Construction
Renovation
Bidding
Santaquin, UT

Crossroads Boulevard/Lehi Main Street Widening Project
Post-Bid
Less than $13,115,529 est. value
Lehi, UT 84043

Bike-Skills Trails Park Phase 2
Post-Bid
Orem, UT 84057

Moyle Drive Roadway Improvement Project
Results
Alpine, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Ridge At Alpine Phase 1
New Construction
Construction
Alpine, UT 84004

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

Lakeshore Landing
New Construction
Pending Verification
American Fork, UT

Fast Gas Parking Lot
New Construction
Pending Verification
Spanish Fork, UT

2020 Eagle Mountain Slurry Seal Project
Post-Bid
Eagle Mountain, UT 84005

2020 Street Rehabilitation Project
Results
Mapleton, UT 84664

Spectrum Academy
New Construction
Construction
$4,000,000 est. value
Pleasant Grove, UT 84062

Northshore Neighborhood
New Construction
Pending Verification
Saratoga Springs, UT

Provo Airport Pavement Maintenance Project
Post-Bid
Provo, UT 84601

Reported 10/08/2021 12:00 AM
Project Title

2021 CDBYI Project (Community Development Building Yard Improvements)

Physical Address View project details and contacts
City, State (County) Eagle Mountain, UT 84005   (Utah County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Concrete, Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 09/27/21
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors to complete site improvements of the Community Development Building Yard located at 2565 N. Pony Express Parkway as Eagle Mountain City - 2021 CDBYI Project. Construction work, in general, consists of installation and erection of steel truck garage, 132,500 square feet of parking lot asphalt, 6,200 square feet of concrete pads, 300 linear-feet of curb and gutter, water line, gas line, power line, sewer lateral and storm water collection/detention systems including but not limited to the potholing and locating existing utilities, saw cutting, removal and proper disposal of existing asphalt, and earthwork.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents