Similar Projects
Rainforest Trailhead Comfort Station Replacement
New Construction, Demolition, Infrastructure
Design
$250,000 to $500,000 est. value
Quinault, WA

Fuller Creek Water Line Crossing
Infrastructure
Bidding
$400,000 est. value
Aberdeen, Elma, WA 98541

Logging Road Resurfacing
Infrastructure
Post-Bid
Montesano, WA

East Pioneer Improvements Academy to Glenn
Infrastructure
Post-Bid
Montesano, WA 98563

Johnson Area Roads Overlay
Infrastructure
Results
$487,238 est. value
Aberdeen, WA 99111

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Greenwood Tie
Infrastructure
Post-Bid
WA

Downtown Aberdeen Revitalization Traffic Improvements
Infrastructure
Results
$1,200,000 to $1,500,000 est. value
Aberdeen, WA 98520

Airfield Pavement Maintenance
Term Contract
Post-Bid
Hoquiam, Quincy, WA 98550

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Homeowner On-Site Septic System
Term Contract, Infrastructure, Alteration
Post-Bid
$25,000 to $100,000 est. value
WA

12th Street Improvements and Water Line Replacement
Infrastructure
Results
Elma, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Bowerman Airport Airfield Pavement Rehabilitation
Term Contract
Results
Aberdeen, WA

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Post-Bid
$210,000 est. value

Last Updated 06/24/2022 05:49 AM
Project Title

East Wynooche Avenue Improvements

Physical Address View project details and contacts
City, State (County) Montesano, WA 98563   (Grays Harbor County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements for which bids will be received is described below: Schedule A: Project consists of roadway improvements for 550 linear feet along E Wynooche Ave and matching intersecting streets in Montesano, Washington. These improvements include roadway excavation; removal of existing storm utilities, catch basin and storm drain piping installations; installation of curb, gutter, sidewalk, ADA ramps; full depth pavement reclamation; HMA Pavement; signing; and striping. Schedule B: Installation of approximately 4-inch, 6-inch, and 8-inch C900 PVC water main; 2 fire hydrants; water services; valves; fittings; appurtenances; and abandonment or removal of existing water utilities.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents