Similar Projects
Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

TRAIL: Coyote Creek Lighting( Under Interstate 280) - City of San Jose
Infrastructure
Conception
Less than $315,000 est. value
San Jose, CA 95154

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

Fisher Basin Expansion Project
Infrastructure
Bidding
$2,100,000 CJ est. value
Morgan Hill, CA 95037

Fisher Basin Expansion Project
Infrastructure
Bidding
$2,100,000 CJ est. value
Morgan Hill, CA 95037

South Loop Project
Infrastructure
Post-Bid
Santa Clara, CA 95134

Reconstruction of Curbs Gutters and Sidewalks
Infrastructure
Post-Bid
$1,150,000 est. value
Cupertino, CA

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

As-Needed Asphalt and Concrete Repair and Replacement Services
Term Contract
Results
Santa Clara, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Kifer Senior Housing
New Construction, Infrastructure
Construction
$13,500,000 CJ est. value
Santa Clara, CA 95051

Icon / Echo
Demolition, New Construction, Infrastructure - 525,000 SF
Pending Verification
$600,000,000 CJ est. value
San Jose, CA 95113

Icon / Echo
Demolition, New Construction, Infrastructure - 525,000 SF
Pending Verification
$600,000,000 CJ est. value
San Jose, CA 95113

Measure T - New Fire Station 36 - City of San Jose
New Construction, Infrastructure
Conception
$11,985,000 est. value
San Jose, CA

Last Updated 03/28/2023 07:10 PM
Project Title

Churchill Avenue/Alma Street Railroad Crossing Safety Improvement Project

Physical Address View project details and contacts
City, State (County) Palo Alto, CA 94306   (Santa Clara County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,210,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides funding for the design and construction of pedestrian and bicycle safety improvements west of Churchill Avenue and Alma Street intersection at the railroad at-grade crossing. Design includes, but is not limited to, traffic signal modifications, street lighting improvements, roadway resurfacing, sidewalk realignment and/or widening, drainage improvements, utility re-locations, signage and striping, and way-finding improvements. Project is included in the City of Palo Alto's FY 2023 - 2027 CIP. As of December 12, 2022, information regarding a general contractor is not available. Design plans are complete and the city is in the process of receiving the necessary approvals for the construction phase. A firm bidding and construction timeline has not been confirmed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Bid Bond - 10.00% Payment Bond - 100.00% Performance Bond - 100.00% Online Q&A - Yes Q&A Deadline - 03/17/2023 1:00 PM (PST)

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents