Similar Projects
Abandoned Coal Mine Restoration
Results
$150,000 est. value

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Waterworks Improvements Phase 1A
Infrastructure
Results
Cambridge City, IN

2022 Sewer Lining Project
Infrastructure
Post-Bid
$130,000 CJ est. value
Richmond, IN 47374

2022 Sewer Lining Project
Infrastructure
Post-Bid
$130,000 CJ est. value
Richmond, IN 47374

Richmond 7 Solar Park
New Construction, Infrastructure
Construction
$6,750,000 CJ est. value
Richmond, IN 47374

Richmond 6 Solar Park
New Construction, Infrastructure
Construction
$8,000,000 CJ est. value
Richmond, IN 47374

Asphalt Resurface
Infrastructure
Bidding
$2,980,576 CJ est. value
Centerville, IN 47330

HMA Overlay, Preventive Maintenance
Infrastructure
Design
$5,104,049 CJ est. value
Richmond, IN 47374

Richmond Municipal Airport - Parking Lot Paving Project
Infrastructure
Post-Bid
$101,000 CJ est. value
Richmond, IN 47374

Replace Superstructure - US 27
Demolition, New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Richmond, IN 47374

Phase 1B Wells and Treatment
Renovation, Infrastructure
Post-Bid
$2,900,000 CJ est. value
Cambridge City, IN 47327

Phase 1B Wells and Treatment
Renovation, Infrastructure
Post-Bid
$2,900,000 CJ est. value
Cambridge City, IN 47327

Phase 1B Wells and Treatment
Renovation, Infrastructure
Post-Bid
$2,900,000 CJ est. value
Cambridge City, IN 47327

Asphalt Resurface - SR 227
Infrastructure
Bidding
$3,000,000 CJ est. value
Richmond, IN 47374

Last Updated 11/22/2022 03:07 PM
Project Title

Waterworks Improvements Phase IB

Physical Address View project details and contacts
City, State (County) Cambridge City, IN 47327   (Wayne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,998,898 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Waterworks Improvements Phase IB. Industrial Park Water System (Division 1) Groundwater Wells: Construction of a new 500 gpm vertical turbine groundwater well (Well No. 3) and well house complete; site and process piping; valves; site work; grading; and restoration. Install new flow meters at existing Well No. 1 and Well No. 2. Owner to furnish all buried water main materials including; pipe, fittings, restraints and fitting restraints. Owner will have materials delivered to the Project Site. Remaining materials provided by Contractor. Water Treatment Plant Improvements: replace aerator trays; remove high service pump ClaValves and replace with check valves; install new high service pump (HSP No. 3) along with process piping and valves; replace filter media; upgrade chlorine equipment. Electrical improvements, and new SCADA system. Elevated Storage Tank: SCADA upgrades; preparation and re-coating interior piping Town Water System (Division 2) Groundwater Wells: Rehabilitation of Town Wells No. 1, 2, and 3 including, televising, cleaning, performance testing, pump head refurbishment, and vertical turbine pumping equipment replacement complete; new motor installation on Well No. 3; and electrical improvements. Water Treatment Plant: New SCADA System. Booster Station: SCADA upgrades Elevated Storage Tank: SCADA upgrades Work shall be constructed under a Lump Sum Contract. Bids shall be properly and completely executed on a State Board of Accounts Form 96 (Revised 2013). Each Bid shall be accompanied by the Contractor's Bid Attachment (included with the Contract Specifications) to Form 96, a Financial Statement (completely filled out and signed) and a bid security in the form of an acceptable certified check payable to the Owner or an acceptable Bidder's bond, in an amount of not less than 5% of the total bid price, in accordance with the Contract Specifications. The Contract will be awarded in accordance with the provisions of IC 5-16-13 for Public Works projects awarded after June 30, 2015. Pursuant to IC 5-16-13-7, the provisions of the law are incorporated by reference. The construction of the project is expected to be funded in part by a State Revolving Fund (SRF) as administered by the Indiana Finance Authority. The Contractor to whom the Work is awarded shall comply with all requirements of said agency . Neither the United States nor any of its departments, agencies, or employees is or will be a party to this Advertisement for Bids or any resulting contract. In accordance with the Davis-Bacon requirements, all contractor and subcontractors are required to pay not less than the Federal prevailing wage rates published by the U.S. Department of Labor for each classification of Work performed on this project. Bidders are notified that there is a 7% MBE and 5% WBE participation goal on this project. A conditional or qualified bid will not be accepted. Award will be made to the low, responsive, responsible bidder and must be approved by the State Revolving Fund Loan as administered by the Indiana Finance Authority. For contracts over $300,000.00, in accordance with IC 5-16-13-10 and IC 8-23-10-0.5, Contractor must be qualified under either IC 4-13.6-4 or IC 8-23-10 (Indiana Department of Administration or Indiana Department of Transportation) before doing any Work on a Public Works project. In accordance with IC 22-5-1.7-11.1, Contractors entering into a contract with the Owner, and contractors of any tier as defined in IC 5-16-13-4, will be required to enroll in and verify the work eligibility status of all newly hired employees through the E-Verify program (effective July 1, 2011), and comply with the reporting requirements of IC 5-16-13-11. In accordance with IC 5-16-13-11, Contractor shall submit an Employee Drug Testing Plan with their Bid and contractors of any tier as defined in IC 5-16-13-4 must comply with the drug testing requirements set forth in IC 4-13-18. Contractors shall complete a Drug Testing Plan Certification to be submitted with their Bid. The Owner reserves the right to waive any informalities or minor defects in bids or bidding procedure, or reject any and all bids, or to accept the bid from the lowest most responsible and responsive bidder as exclusively determined by the Owner. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. No Bidder may withdraw a bid within 90 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder determined by the Owner to be the lowest most responsible and responsive. Submission of a signed Bid by the Bidder constitutes acknowledgment of and acceptance of all the documents and terms and conditions of the Contractual-Legal Requirements and Technical Sections of the specifications in the Project Manual. The Contractor to whom the Work is awarded will be required to furnish an acceptable Performance and Payment Bond each in the amount of 100% of the contract price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents