Last Updated | 07/22/2022 09:07 AM |
Project Title | Mallory Town Hall Chimney Replacement |
Physical Address | View project details and contacts |
City, State (County) | Sherman, CT 06784 (Fairfield County) |
Category(s) | Government/Public |
Sub-Category(s) | Capitol/Court House/City Hall |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $131,387 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project scope: 1. Demo existing chimney from top down to roof line 2. Install scaffolding. Lay tarps and plywood over roof area around the chimney 3. Build new chimney with bricks that match the same color and style as the previous chimney 4. Replace any cracked or disintegrated flues if needed 5. New concrete wash cap, replace current chimney cap 6. Install new copper flashing, solder the entire flashing to create barrier between upper and lower chimney 7. Remove all waste from site when project is finished INSURANCE REQUIREMENTS: The successful Firm agrees to maintain in enforce and in compliance with the below limits for the complete term of the contract. General Liability Each Occurrence 1,000,000 General Aggregate 2,000,000 Auto Liability Combined Single Limit Each Accident 1,000,000 Professional Liability 2,000,000 Excess Liability/ Umbrella 1,000,000 On the attached Fee Proposal Sheet, all Proposers must provide a straightforward lump sum fee proposal to perform all the work in this RFP. The fee proposal must be signed by a legal representative of the Proposer's company authorized to negotiate and bind the firm to the contract in the event the firm is selected. The fee proposal must include all direct costs associated with the performance of the work required in this RFP included but not limited to administrative fee, processing fee, reproduction fees, communication fees, and transmittal fees. No additional compensation will be considered. A response to an RFP is an offer to contract with the Town of Sherman based upon the terms, conditions and specifications contained in the this RFP. Proposals do not become contract unless and until executed by the BOS. The Proposer shall take out and maintain during the life of the contract adequate Workman's compensation Insurance for all the employees employed on said work. In case any class of employees or subcontractors is engaged in hazardous work under the contract at the site of the work is not protected under the Workman's Compensation statute, the contractor shall provide Workman's Compensation Insurance for the protection of employees not otherwise protected. All proposed and recommended work is to meet State and Town building codes and follow any other Town codes or ordinance that applies. The Town of Sherman will not be held responsible for any costs incurred by the contractor for work performed in the preparation for submitting the proposal. The proposal shall be comprehensive to complete all phases of the work described. The area should be left broom clean and all debris and excess materials removed. The Town of Sherman reserves the right to reject any and all proposals. The Town also reserves the right to waive technical defects, irregularities, and omissions if in its judgment it deems the proposal to be in the Town's best interest. Questions regarding this RFP can be directed to Don Lowe, First Selectman, at 860 355 1139. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |