Similar Projects
Metro Parkway Resurfacing - Mound Road to Ryan Road - City of Sterling Heights
Infrastructure
Conception
$1,200,000 est. value
Sterling Heights, MI 48310

Dobry Drive Resurfacing - Ryan Road East To Crossover
Alteration
Conception
$1,000,000 est. value
Sterling Heights, MI 48310

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

Take 5 Oil Change / Warren
New Construction, Infrastructure - 1,430 SF
Post-Bid
$420,000 CJ est. value
Warren, MI 48093

Take 5 Oil Change / Warren
New Construction, Infrastructure - 1,430 SF
Post-Bid
$420,000 CJ est. value
Warren, MI 48093

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pmc Project-Hma Paving Various Routes
Infrastructure
Results
Saint Clair Shores, MI

Valvoline
New Construction, Renovation - 3,776 SF
Construction
$500,000 to $1,000,000 CJ est. value
Shelby Township, MI

Circle A
Demolition, New Construction, Infrastructure, Renovation - 3,612 SF
Pending Verification
$1,500,000 CJ est. value
Sterling Heights, MI 48310

Circle A
Demolition, New Construction, Infrastructure, Renovation - 3,612 SF
Pending Verification
$1,500,000 CJ est. value
Sterling Heights, MI 48310

15 Mile Road Resurfacing - Van Dyke Avenue to Maple Lane - City of Sterling Heights
Infrastructure
Conception
$1,200,000 est. value
Sterling Heights, MI 48310

Speedway Gas Station and Convenience Store / Shelby Township
New Construction, Infrastructure - 4,608 SF
Design
$1,400,000 CJ est. value
Shelby Township, MI 48317

2022 High School Paving Work
Infrastructure
Post-Bid
Richmond, MI 48062

2021 Paving and Masonry Restoration Projects Bid Package #1-Paving Projects
Alteration
Results
Mount Clemens, MI

Last Updated 02/28/2023 11:30 AM
Project Title

Hayes Road Service Station Redevelopment

Physical Address View project details and contacts
City, State (County) Clinton Township, MI 48038   (Macomb County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 2023, the owner is awaiting approvals from the Clinton Township Planning Commission for a special land use and site development plan. Architect and selection of General Contractor is unknown. Construction start, though unconfirmed is possible by fourth quarter 2023.*

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents