Similar Projects
Mecklenburg County Jail Central Partial Roof Replacement
Post-Bid
Charlotte, NC

Harris Building Skylight Replacement
Post-Bid
Charlotte, NC 28208

Terne Plate Replacement and Elastomeric Roofing Overlay. Southern Pines, NC
Results
Southern Pines, NC

Fuller Administration Building Roof Replacement
Results
Durham, NC

Wilson Library Partial Roof Replacement and Exterior Repair Project
Construction
$1,900,000 est. value
Raleigh, NC

Public Utilities Buildings Roof Replacement
Post-Bid
Lillington, NC

J.W. Seabrook Auditorium Roof Replacement Project
Results
Fayetteville, NC

Smith Recreation Center Roof Replacement
Post-Bid
Fayetteville, NC 28301

ES King Village - Roof Upgrades Phase III
Results
Less than $884,000 est. value
Raleigh, NC 27695

Student Center Roof Replacement
Post-Bid
Kinston, NC

Barbee Hall Roof Replacement
Results
Greensboro, NC

Replace Roof Decking and Shingles on Three (3) Community Buildings
Post-Bid
Lumberton, NC 28358

Phases 4 Re-Roofing and Roof Framing Repairs to Operations Center
Results
Fayetteville, NC

Roof Repairs to Apartment Buildings and Administrative Office
Post-Bid
Bladenboro, NC 28320

Z--WRBR Roof
Results
$25,000 to $100,000 est. value
Kill Devil Hills, NC 27948

Reported 01/25/2019 12:00 AM
Project Title

Screening Information Request (SIR)/Request for Quote (RFQ) Tar River (North Carolina) VOR Facility Re-Roof, Refurbishment Effort.

Physical Address View project details and contacts
City, State (County) Washington, NC   (Beaufort County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $90,000 to $300,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The Contractor shall perform the following work: 1. Furnish and install a new elastomeric reflective roof membrane on TYI VOR equipment building. Remove and discard old roof. Clean and prepare surfaces for new roof. All work to be done in accordance with the attached drawings & specifications. a) This work requires an extended shutdown of VOR service. Provide one month advance notice to FAA. Verify NOTAM's have been made. Obtain written permission from FAA to begin work. b) Make arrangements with an FAA Technician to take the VOR out of service & de-energize antenna power. Un-fasten antenna cable located within tipi and remove electrical wiring harness from antenna motor. Wrap connectors in plastic bags w/electrical tape to prevent damage during construction. c) Provide crane services to remove fiberglass antenna cover. Cover is cone shaped 20' high with 10' diameter base. Cover weighs approximately 500lbs. Remove TACAN antenna motor. Unbolt top cover & ring and remove from main tipi. Unfasten & pry off main tipi and remove from roof deck. d) Unbolt and remove 50 mushroom antennas, brackets and, posts. Carefully collect all nuts, bolts, washers & plates and, store for re-use. Arrange with FAA Technician to disconnect coaxial cable from each antenna. Protect coax connectors with plastic bags and electrical tape. Tie wrap antenna cables out of the way. e) Completely tear off all old roofing, metal terne plate, and vapor barrier in order to fully expose wood roof decking. Carefully cut any metal connecting the metal counterpoise extension to the roof. Disconnect grounding down leads. Provide a 2" space separating wood roof from metal extension. Broom clean all debris from deck. f) Tear off all old roofing from underneath tipi. De-solder terne plate from steel antenna pedestal mounting ring. g) Repair and replace any damaged wood decking with new 2"x6", type 2, pressure treated lumber. Contractor will include 200 square fet of wood deck replacement in his base bid. Any damaged wood that exceeds 200 square feet shall be replaced by contract modification per unit price. This unit price must be contained in the Contractor's bid offer.
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents