Similar Projects
M-5 Maintenance Facility Access Improvements
Infrastructure
Bidding
$400,000 est. value
Schaumburg, IL 60168

174th Street, 66th Court and 173rd Place Roadway Improvements and Water Main Replacement
Infrastructure
Bidding
$625,000 est. value
Tinley Park, IL 60487

Construction Management Services Pavement Preservation and Rehabilitation Services at Various Locations
Post-Bid
Chicago, IL

2021 Purchase of Hot Mix Asphalt
Post-Bid
Des Plaines, IL

I-19-4476 Roadway and Bridge Widening and Reconstruction
Results
$25,000,000 to $50,000,000 est. value
IL

Smart Overlay, Class D Patching and ADA Improvement
Results
Brookfield, IL 60513

2022 CDBG/TIF Alley Improvements
Infrastructure
Bidding
$421,000 est. value
Summit, IL

2021 Summer Paving
Post-Bid
Buffalo Grove, IL

(1.74-Mile) Improvement
Results
Hillside, Westchester, IL 60162

2021 Green Alley Program
Infrastructure
Bidding
$464,255 est. value
Summit, IL

Niles West High School 2021 Paving and Sealcoating
Post-Bid
Skokie, IL 60077

Crack and Joint Sealing on PCC Pavement
Results
Barrington, Hoffman, Palatine, IL

Ole A. Thorp Elementary Scholastic Academy Playground Renovation
Renovation, Infrastructure
Bidding
Chicago, IL 60634

2021 Pietrini School Traffic Flow Alteration
Post-Bid
Franklin Park, IL 60131

2021 Melinda/Hiawatha Water and Street Improvements
Results
Buffalo Grove, IL 60089

Reported 05/05/2022 12:00 AM
Project Title

2022 Street Program

Physical Address View project details and contacts
City, State (County) Oak Lawn, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction: Reconstruction includes the following typical sections: 2" Hot-Mix Asphalt Surface Course, 4" Hot-Mix Asphalt Binder Course, and 12" Aggregate Base Course, along with 5% undercutting and 100% curb replacement and structure adjustments and sidewalk replacement. Hot-in-Place Resurfacing: Hot-In-Place (HIP) typical section will include a 4-foot edge grind, Hot-In-Place Surface Recycling, and resurfacing with 2" HMA Surface Course. Also, this includes structure adjustments, curb spot repair and sidewalk spot repair.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents