Similar Projects
Winkler Road Improvements
Infrastructure
Bidding
$300,000 est. value
Three Lakes, WI 54562

Chip Seal, Fog Seal, GSB-88 and Prep Work 2021 Road Maintenance
Post-Bid
Rhinelander, WI

Bolger Lake Road Work
Infrastructure
Post-Bid
Minocqua, WI 54548

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Hancock Oneida Road Reconstruction
Results
WI

Rhinelander-Oneida County Airport
Infrastructure
Post-Bid
Rhinelander, WI

Paving Approximately 5 Miles of Roads
Results
Hazelhurst, WI

Pulverizing and Paving Several Town Streets and Roads
Infrastructure
Post-Bid
Lake Tomahawk, WI

2021 Road Improvements
Results
Three Lakes, WI

Contract A - 2022 Road Improvements
Infrastructure
Post-Bid
Three Lakes, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Contract B - 2022 Road Improvements
Infrastructure
Post-Bid
$300,000 est. value
Three Lakes, WI

2021 Monico Street Improvements
Results
Rhinelander, WI 54501

Ohlson Lane Utility and Street Improvements
Infrastructure
Post-Bid
$160,000 est. value
Rhinelander, WI 54501

Minocqua - Manitowish, Woodland Drive - CTH M
Results
Manitowish, Minocqua, WI 54545

Reported 05/18/2022 12:00 AM
Project Title

River Road Improvements

Physical Address View project details and contacts
City, State (County) Rhinelander, WI 54501   (Oneida County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $376,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract consists of a single contract including pulverizing of the existing asphalt surface, addition of base course, shaping to produce acceptable drainage and asphalt pavement construction on River Road, from Eagles Bluff Road to Hilstrom Drive in the Town of Pine Lake. This contract consists of the following approximate quantities: Pulverizing 4.83 miles 3/4 -inch CABC Placement 14,200 tons Hot-mix Asphalt Pavement 7,320 tons

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents