Similar Projects
Last Updated | 10/01/2021 05:10 PM |
Project Title | 2021 HMA Patching |
Physical Address | View project details and contacts |
City, State (County) | IL (Winnebago County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed work is a 2" HMA surface removal with placement of a 2" polymerized stone matrix HMA asphalt to repair pavement on Baxter Road (east of IL-251), Cunningham Road (west of Meridian Road), and Mulford Road (north of Linden Road). The proposed work will also include 2" HMA surface removal and 2" PCC surface removal with placement of 2" IL-9.5 HMA asphalt to repair pavement on McCurry Road (I-90 overpass) and on Riverside Boulevard (between Forest Hills Road and Alpine Road) |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |