Similar Projects
FM 108 Linear Improvements - City of Republic
Infrastructure
Conception
$1,523,500 est. value
Republic, MO

FM 115 Inflow and Infiltration Reduction - City of Republic
Infrastructure
Conception
$1,440,500 est. value
Republic, MO

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

Boyce Mixed Use Development
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
Republic, MO 65738

Resurface and Ada Improvements - Kearney Street
Infrastructure
Bidding
$10,000,000 CJ est. value
Springfield, MO 65803

Landfill Gas Collection and Control System PH VI
Infrastructure
Bidding
$275,000 CJ est. value
Willard, MO 65781

Building Demolition and Site Cleanup (List 10-26)
Demolition, Infrastructure
Post-Bid
Springfield, MO

Springhouse Village East 2
New Construction, Infrastructure
Post-Bid
$15,986,300 CJ est. value
Springfield, MO 65802

Valves
Infrastructure
Results
Springfield, MO 65807

Water System Materials
Infrastructure
Results
Springfield, MO

Element By Westin - Marriott / Springfield
New Construction, Infrastructure - 71,477 SF
Construction
$22,000,000 CJ est. value
Springfield, MO 65807

Buc-ee's / Springfield
New Construction, Infrastructure - 53,000 SF
Construction
$28,000,000 CJ est. value
Springfield, MO 65803

Simply Smart Self-Storage Facility
New Construction, Infrastructure - 55,500 SF
Pending Verification
$6,000,000 CJ est. value
Republic, MO 65619

OZMOD 425
Demolition, New Construction, Infrastructure - 37,533 SF
Pending Verification
$10,500,000 CJ est. value
Springfield, MO 65803

Farm Road 103 (Future MM) South Of US 60 - City of Republic
Infrastructure
Conception
$1,500,000 est. value
Republic, MO 65619

Last Updated 05/30/2023 11:03 PM
Project Title

Group 6 Public Sewer Rehabilitation - Sewer Main Cleaning, CCTV and Cured-in-Place Pipe (CIPP)

Physical Address View project details and contacts
City, State (County) Springfield, MO 65806   (Greene County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,740,724 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Cleaning approximately 113,000 linear feet of sewer main, ranging from 8-inch to 36- inch diameter. The majority of the pipe will be 8-inch Vitrified Clay Pipe (VCP). CCTV of approximately 113,000 linear feet of sewer main, ranging from 8-inch to 36-inch diameter. The majority of the pipe will be 8-inch VCP. Pre- and post-rehabilitation CCTV will be required. Note that NASSCO PACP/LACP/MACP standards are to be followed. The City expects thorough video of each service lateral connection to drive future rehabilitation of those connections. Post-rehabilitation CCTV will be completed after all main line CIPP rehabilitation is completed in a batch order. CIPP rehabilitation of approximately 113,000 linear feet of the cleaned and televised sewer main at the discretion and authorization of Owner. The majority of the existing pipe to be lined will be VCP with a small amount of Reinforced Concrete Pipe (RCP) and other pipe types of 8-inch diameter to 36-inch diameter. The majority of the pipe will be 8-inch VCP

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents