Similar Projects
Last Updated | 05/30/2023 11:03 PM |
Project Title | Group 6 Public Sewer Rehabilitation - Sewer Main Cleaning, CCTV and Cured-in-Place Pipe (CIPP) |
Physical Address | View project details and contacts |
City, State (County) | Springfield, MO 65806 (Greene County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,740,724 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Cleaning approximately 113,000 linear feet of sewer main, ranging from 8-inch to 36- inch diameter. The majority of the pipe will be 8-inch Vitrified Clay Pipe (VCP). CCTV of approximately 113,000 linear feet of sewer main, ranging from 8-inch to 36-inch diameter. The majority of the pipe will be 8-inch VCP. Pre- and post-rehabilitation CCTV will be required. Note that NASSCO PACP/LACP/MACP standards are to be followed. The City expects thorough video of each service lateral connection to drive future rehabilitation of those connections. Post-rehabilitation CCTV will be completed after all main line CIPP rehabilitation is completed in a batch order. CIPP rehabilitation of approximately 113,000 linear feet of the cleaned and televised sewer main at the discretion and authorization of Owner. The majority of the existing pipe to be lined will be VCP with a small amount of Reinforced Concrete Pipe (RCP) and other pipe types of 8-inch diameter to 36-inch diameter. The majority of the pipe will be 8-inch VCP |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |