Similar Projects
Housing Commission: 309 S Ashley - MF-CB-22-04 - City of Ann Arbor
New Construction, Infrastructure
Conception
$130,000,000 CJ est. value
Ann Arbor, MI 48103

Runway Safety Extension - TR-AP-10-04 - City of Ann Arbor
Addition, Infrastructure
Conception
$4,726,000 CJ est. value
Ann Arbor, MI 48108

Depot Street Mixed-Use Development
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Ann Arbor, MI 48104

Mill Creek Brewery Development / Dexter
New Construction, Infrastructure
Design
$1,725,000 CJ est. value
Dexter, MI 48130

Parkland Plaza Senior Living Facility - Rebid
New Construction, Infrastructure - 163,690 SF
Post-Bid
$50,000,000 CJ est. value
Ann Arbor, MI 48103

The Grove at Veridian
New Construction, Infrastructure - 10,076 SF
Post-Bid
$10,000,000 CJ est. value
Ann Arbor, MI 48104

Staebler Farm County Park Multipurpose Building and Site Construction
New Construction, Infrastructure
Results
Ann Arbor, MI 48105

WWTP UV Building Fourth Channel
Renovation
Results
Ypsilanti, MI 48198

Mill Creek Townhomes
New Construction, Infrastructure, Renovation - 7,010 SF
Construction
$21,000,000 CJ est. value
Ann Arbor, MI 48108

People-Friendly Streets Part 2 - TR-AT-20-06 - City of Ann Arbor
Infrastructure
Construction
$5,851,000 CJ est. value
Ann Arbor, MI 48104

Miller Avenue Apartments
New Construction, Infrastructure - 16,875 SF
Pending Verification
$3,000,000 CJ est. value
Ann Arbor, MI 48104

220 North Park Duplexes And Cottages
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Ypsilanti, MI 48198

Fuller Pool Spray Park - MF-PR-10-15 - City of Ann Arbor
New Construction, Infrastructure
Conception
$800,000 CJ est. value
Ann Arbor, MI 48105

Tommy's Express Carwash / Ypsilanti
New Construction, Infrastructure - 4,553 SF
Design
$1,100,000 CJ est. value
Ypsilanti, MI 48197

New Fire Station 4 - City of Ann Arbor
Demolition, New Construction, Infrastructure - 12,097 SF
Post-Bid
$6,000,000 CJ est. value
Ann Arbor, MI 48104

Last Updated 03/23/2023 11:14 AM
Project Title

Valve and Finished Water Tank and Reservoir Improvements

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48103   (Washtenaw County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,910,734 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this Request for Proposal (RFP) is to select a firm to provide construction services to complete work at the Ann Arbor Water Treatment Plant including the replacement of existing valves, improvements to existing utility structures, and the recoating of existing process piping. The work also includes miscellaneous improvements at multiple finished water storage tanks and reservoirs including steel pipe and surface recoating, access and ventilation improvements, and overflow piping replacement. Question Acceptance Deadline 06/14/2022 03:00 PM EDT Questions are submitted online No

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents