Similar Projects
Kump Field Parking Lot- City of Elko
Infrastructure
Conception
$600,000 CJ est. value
Elko, NV 89801

Kump Field Parking Lot- City of Elko
Infrastructure
Conception
$600,000 CJ est. value
Elko, NV 89801

GAOA Lamoille Pavement Preservation Phase 2 Project for the Humboldt-Toiyabe National Forest
Alteration
Design
$250,000 to $500,000 est. value
Elko, NV

West Wendover Community Rec Center
New Construction, Infrastructure - 25,000 SF
Design
$5,000,000 CJ est. value
West Wendover, NV 89883

2nd Street Paving Project
Infrastructure
Bidding
$500,000 CJ est. value
Carlin, NV 89822

2nd Street Paving Project
Infrastructure
Bidding
$500,000 CJ est. value
Carlin, NV 89822

Bridge Construction SFIR 3(1)
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Elko, NV 89801

Bridge Construction SFIR 3(1)
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Elko, NV 89801

Wells Municipal Airport
Infrastructure
Results
$360,000 est. value
Wells, NV 89835

2022 Micro Slurry Project
Infrastructure
Results
$564,007 est. value
Elko, NV

Angel Park Apartments
New Construction, Infrastructure
Pending Verification
$13,500,000 CJ est. value
Elko, NV 89801

Elko Retail Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Elko, NV 89801

Newton Field Parking Lot - City of Elko
Infrastructure
Conception
$600,000 CJ est. value
Elko, NV 89801

Ash Street Village Townhomes
New Construction, Infrastructure
Design
$4,526,400 CJ est. value
Elko, NV 89801

Pavement Maintenance & ADA Site Upgrades Nevada Youth Training Center
Infrastructure
Bidding
$534,000 CJ est. value
Elko, NV 89801

Last Updated 04/13/2023 06:36 PM
Project Title

Improvements to the Elko Regional Airport

Physical Address View project details and contacts
City, State (County) Elko, NV 89801   (Elko County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule I (Federal) - Rehabilitate Air Carrier Apron Schedule II (Non-Federal) - Rehabilitate Air Carrier Apron Schedule III (Federal) - Air Carrier Apron Pavement Maintenance Schedule IV (Non-Federal) - Air Carrier Apron Pavement Maintenance Construction Construction for this project is expected to take 119 calendar days. last day questions March 23, 2023 at 3:00 pm (local time) All bidders shall appear on the official plan holder's list. It is the planholder's responsibility to review the site for addendums and changes before submitting their proposal A. Bid Opening: March 30 B. Notice of Award: April 2023 C. Notice to Proceed: June 2023 (Pending award of FAA grant) D. Project Time: Refer to Section 80-07, -08 for more information. I. Total Project: 119 Calendar Days (17 weeks) (1) Schedule I: 7 Calendar Days (2) Schedule II: 22 Calendar Days (3) Schedule III: 50 Calendar Days (4) Schedule IV: 40 Calendar Days

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Airfield Signaling and Control Equipment.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents