Similar Projects
Racetrack Road Water Line Project
Infrastructure
Bidding
$100,000 est. value
Woodruff, SC

Road Work - E. Ashley Avenue, Folly Beach Drainage Improvements, Waterline Replacement and Sidewalk Replacement CTC
Infrastructure
Bidding
Charleston, SC

Huger Street and King Street Water Main Replacement Project
Post-Bid
Charleston, SC 29401

Ben Sawyer Intracoastal Waterway Water Main Crossing
Post-Bid
Charleston, SC 29401

Beach Club Villas Water Main Replacement
Results
Isle of Palms, SC 29451

PS001 Force Main Replacement Phase 1 and 2
Results
Goose Creek, SC 29445

East Water Meter
Alteration
Bidding
York, SC

Materials Contract
Term Contract
Post-Bid
Mount Pleasant, SC 29464

Highway 21 Force Main Replacement Project
Results
York, SC 29745

Water Pipe Replacement Project
Infrastructure
Bidding
$600,000 to $900,000 est. value
Kershaw, SC

Backflow Prevention
Post-Bid
Florence, SC 29501

Landrum Vaughn Creek Raw Water Line Replacement Project
Results
Spartanburg, SC 29301

Water System Improvements at Edgefield County Industrial Park
Infrastructure
Bidding
Edgefield, SC

GSWA Pipeline Contract 14
Post-Bid
Conway, SC 29528

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 09/16/2021 04:26 PM
Project Title

Evergreen Area Waterline Improvements

Physical Address View project details and contacts
City, State (County) Anderson, SC   (Anderson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing approximately 3,700 LF of new 2-inch water distribution mains, 980 LF of new 6-inch water distribution mains, one (1) new fire hydrant, the installation of new residential water services, meter replacements, the abandonment of existing distribution mains, sediment and erosion control, and other necessary appurtenances and associated tasks.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents