Similar Projects
HVAC Air Purification System Transit Administration Building
Alteration
Bidding
$70,000 est. value
Colorado Springs, CO 80903

Improvements to the HVAC System Windows and Indoor Air Quality Berg Building
Post-Bid
Less than $1,417,414 est. value
Colorado Springs, CO 80900

HVAC and Mechanical Products
Term Contract
Post-Bid

Pioneers Museum Offsite Storage HVAC Upgrade
Results
Less than $399,830 est. value
Colorado Springs, CO 80903

Hoods & Ducts Cleaning, Peterson AFB
Results
Colorado Springs, CO 80914

Weatherization Materials - Energy Resource Center
Term Contract, Alteration
Construction
Colorado Springs, CO 80903

2019-056M19 / Replace Campus Domestic Hot Water System
Post-Bid
$747,089 est. value
Colorado Springs, CO 80903

Heat Exchanger Tube Bundles
Results

CTF FCF Boiler No 1 Installation Bp2 IFB CMS167253
Alteration
Post-Bid
$400,000 est. value
Colorado Springs, CO

Heat Treat Services
Results
CO

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Chiller Removal and Replacement
Alteration
Results
Less than $210,000 est. value
Colorado Springs, CO

HVAC Unit Replacements
Alteration
Post-Bid
Broomfield, Colorado Springs, Peyton, CO 80831

CU Denver PN20-112394 - SCPP Only
Alteration
Results
$125,000 est. value
Denver, CO 80204

USAFA Fy22 Grease Laden Duct Cleaning Service
Term Contract
Post-Bid

Last Updated 05/27/2022 02:37 PM
Project Title

CM Engineering Building VAV Replace and Control Upgrade

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,999,350
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids for the Controlled Maintenance Engineering Building VAV Replace and Controls Update. The project consists of the removal of the existing VAV terminal units, reheat valves and associated piping appurtenances; replacing them with new electronic control fan powered boxes with high-efficiency electronically communicated (EC) motors & new 2-row heating coils. Miscellaneous scope will include removal and replacement of ceilings, hot water system drain down, cleaning, hot water coil reconnection with new piping appurtenances, flexible duct connectors, ductwork patch / seal, etc. The existing pneumatic temperature controls will be upgraded to the University’s standard DDC system, including new ball-type control valves.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents