Similar Projects
Demolition of Five (5) Residential Structures
Demolition
Post-Bid
Beaumont, TX 77705

Demolition and Abatement IDIQ- Plains Area - South
Post-Bid
$2,000 to $2,000,000 est. value

Demolition Services
Demolition, Term Contract
Results
New Braunfels, TX

Removal of Structure/Building
Demolition
Results
Houston, TX

Parkland Buildings Demolition
Demolition
Post-Bid
Dallas, TX

Demolition of 9 Residential Properties With Transite Siding
Results
Houston, TX

Code Compliance Abatement for Residential Substandard Structure Demolition
Demolition, Alteration
Post-Bid
Texas City, TX

Demolition Of Five (5) Residential Structures
Demolition
Results
Beaumont, TX 77705

UNT College Inn Demolition
Demolition
Post-Bid
Denton, TX 76201

Demolition and Salvage of Nall Lane Substation
Demolition
Results
Bryan, TX 77801

Rnd Skeet Range Demo
Term Contract
Post-Bid
Jbsa Randolph, TX

Building Demolition Services
Demolition
Results
Longview, TX

Reported 04/08/2022 04:02 AM
Project Title

Demolition of Cottage Creek Building 15

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78218   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Provide all labor, material, supplies, equipment, supervision and insurance, etc. to accomplish the abatement and demolition of the entire existing structure down to the slab. a. Beacon is engaging the services of an engineer to determine if the slab will also be demolished and disposed of. b. Respondents must provide additional detail regarding the schedule to include times for removal work, starting and ending dates for each activity and final timeline to complete the project. 2. Existing city curbs and sidewalks are to remain in place if present. 3. If the foundation is determined to be faulty and be removed, leave lot level where the foundation was removed and insure that the area is level, smooth and free of debris after demolition and does not allow for standing water. If fill is needed it shall not be spoil materials. 4. A temporary construction fence has been installed around the site to be demolished; Contractor shall assume the rental of this fence before the actual demolition is scheduled to occur. 5. Cap any existing water, gas, and sewer lines to include underground electrical conduit below grade per COSA requirements before demolition and if required after slab removal. 6. Remove debris in accordance with City, State and Federal regulations and at a landfill meeting regulatory requirements. Respondent will provide location of landfill being used to dispose of debris. a. Beacon reserves the right to obtain copies of the dump tickets 7. Perform all work in accordance with OSHA, EPA, TDH, and Federal, State and local rules and regulations. 8. Fill and lightly compact any depressions, ruts, or holes left by the removal with sandy loam topsoil free of debris, large stones, and noxious weeds etc. 9. Contractor is responsible to check for any utilities (call 811) and have them marked prior to start of demolition.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents