Similar Projects
Eastern Third High Service Pump - City of Eustis
Renovation
Conception
$325,000 CJ est. value
Eustis, FL 32726

CROM Tank Repairs - City Of Eustis
Renovation, Infrastructure
Conception
$300,000 CJ est. value
Eustis, FL 32726

The Vue at Clermont
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Clermont, FL 34711

Costco / Clermont
New Construction, Infrastructure - 151,000 SF
Design
$12,000,000 CJ est. value
Clermont, FL 34711

7-Eleven #42219 / Eustis
New Construction, Infrastructure - 5,254 SF
Bidding
$900,000 CJ est. value
Eustis, FL 32736

Unpaved Trails Grounds Maintenance and Related Services
Infrastructure
Bidding
$700,000 CJ est. value
Tavares, FL 32778

7-Eleven #42219 / Eustis
New Construction, Infrastructure - 5,254 SF
Post-Bid
$900,000 CJ est. value
Eustis, FL 32736

Holiday Inn Express / Mount Dora
New Construction, Infrastructure - 53,545 SF
Post-Bid
$14,000,000 CJ est. value
Mount Dora, FL 32757

WRF Expansion Phase 2
Addition
Results
$13,700,000 est. value
Lady Lake, FL

Lake Ella Road Safety Improvements
Infrastructure
Results
$1,041,727 CJ est. value
Fruitland Park, FL 34731

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

O Reilly Auto Parts (TVA) #6636 / Tavares
New Construction, Infrastructure - 7,225 SF
Construction
$1,900,000 CJ est. value
Tavares, FL 32778

Turnpike Logistics Center
New Construction, Infrastructure - 977,000 SF
Pending Verification
$63,500,000 CJ est. value
Groveland, FL 34736

Waste Water Treatment Facility Expansion
Addition
Pending Verification
Clermont, FL

Heathrow Water Treatment Plant Ground Storage Tank - City Of Eustis
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Eustis, FL 32726

Last Updated 05/15/2023 02:51 PM
Project Title

SRF WTP No. 1 and 3 Expansion

Physical Address View project details and contacts
City, State (County) Lady Lake, FL 32159   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,670,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work Completion of Well No. 4 and Well No. 5, and expansion to the Town's Water Treatment Plant No. 3. Well No. 4 and Well No. 5 are 16" Upper Floridan wells drilled and cased to a depth of 400 lineal feed below land surface. Each well shall be fitted with a 100 HP vertical turbine pump with associated site, mechanical, electrical, and instrumentation improvements. Expansion to WTP No. 3 will include an additional 400,000 gallon pre-stressed ground storage tank with aerator, as well as an additional 25 HP split-case high service pump with associated site, mechanical, electrical, and instrumentation improvements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents