Similar Projects
Southeast Zone Improvements - 281162 - City of Topeka
Infrastructure
Conception
$12,336,000 est. value
Topeka, KS

South East Quincy Street from 8th Street to 10th Street - 601098 - City of Topeka
Infrastructure, Alteration
Conception
$950,000 est. value
Topeka, KS 66612

New Washburn Rural Middle School - 2022 Bond - Auburn Washburn Public Schools
New Construction, Infrastructure - 138,000 SF
Design
$48,647,000 CJ est. value
Mission, KS 66614

Downtown Innovation Campus ( ASTRA Innovation Center )
New Construction, Infrastructure - 70,000 SF
Design
$11,000,000 CJ est. value
Topeka, KS 66603

Structural Demolition
Demolition, Infrastructure
Bidding
$30,000 CJ est. value
Topeka, KS 66603

Conveyor System Shaftless Screw Spiral Replacement Installation
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Topeka, KS 66616

Southwest Gage Boulevard Water Main Replacement Project
Infrastructure
Post-Bid
$300,000 est. value
Topeka, KS 66630

South West West Hills Drive Water Main Replacement Project
Infrastructure
Post-Bid
$400,000 est. value
Topeka, KS 66606

North West Tyler Street (Lyman Road to Beverly Street) North West Tyler Water Line (Lyman Road to Paramore Street)
Infrastructure
Results
Topeka, KS 66608

West Ridge Mall Water Main Replacement
Infrastructure
Results
Topeka, KS 66630

Replacing the Bridge on SW 61st Street Over Six-Mile Creek
Demolition, New Construction, Infrastructure
Construction
$863,802 CJ est. value
Topeka, KS 66610

Southwest Auburn Road Solar Farm
Infrastructure
Construction
$10,000,000 CJ est. value
Topeka, KS 66610

Hill's Pet Nutrition Expansion / Project Prince
New Construction, Infrastructure
Pending Verification
$31,400,000 CJ est. value
Topeka, KS 66617

North Topeka Storage
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Topeka, KS 66608

West Zone Improvements - 281163
Alteration
Conception
$4,906,838 est. value
Topeka, KS 66612

Last Updated 07/05/2023 04:16 PM
Project Title

Sherwood South 1.0-MG Elevated Water Storage Tank Project

Physical Address View project details and contacts
City, State (County) Topeka, KS 66610   (Shawnee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $4,762,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Question and Answer closes May 4, 2023 at 5:00 PM. Installation of a new 1-million-gallon elevated water storage tank; drive and parking; miscellaneous electrical work, utility improvements, site grading, coatings, and appurtenances. All bids must be accompanied by a cashiers check or a bid bond for not less than five percent (5%) of the amount bid (including alternates), made payable to the City of Topeka, Kansas. The original bid security shall be in the office of Contracts and Procurement before the closing date. Bid Closing will be public following receipt of Bids at the office of the Contracts & Procurement Division, 215 E. 7th Street, Basement, Room 60, Topeka, KS 66603. Bid Submittal requirements are explained in the Instructions to Bidders. All persons seeking to enter into a contract with the City shall submit an acceptable affirmative action program in accordance with Section 2.135.130 of the Code of the City of Topeka, Kansas. Bidders shall take note of requirements for notification of Minority Business Enterprises and Woman Business Enterprises as stated in paragraph 24 of the Instruction to Bidders. Electronic Copies: No Charge. Electronic copies of the bid documents (plans and specifications) and any addenda are available using the Topeka e-procurement system All questions about the meaning or intent of the Contract Documentsshall be submitted only through the City of Topeka's e-Procurement System Question Deadline 05/01/2023

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents