Similar Projects
Asphalt Surface Treatment
Infrastructure
Bidding

2022 Chip Seal
Infrastructure
Bidding
SD

Street Improvements
Post-Bid
Volga, SD

Asphalt Overlay and Asphalt Patching
Post-Bid
Brookings, SD 57006

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Chip Seal
Results
$280,000 to $300,000 est. value
Brookings, SD

Water Meters, Pipe, Fittings and Valves
Infrastructure
Bidding
Brookings, SD 57006

2021 Concrete Pavement Rehabilitation
Post-Bid
$783,562 est. value
SD

2021 Chip Seal
Results
SD

Asphalt Overlay and Asphalt Patching
Post-Bid
SD

Northwest Industrial Park
Results
$700,000 to $800,000 est. value
Volga, SD

Parking Lot 163 Improvements
Infrastructure
Post-Bid
Brookings, SD 57006

Sidewalk Maintenance
Results
Brookings, SD

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Street Maintenance and Overlay
Results
Brookings, SD

Last Updated 03/08/2022 10:00 AM
Project Title

Prairie Hills Addition Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Brookings, SD   (Brookings County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,600,000 to $2,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule A a. Approximately 75,625 CY of Unclassified Excavation, 93,500 CY of Strip, Stockpile, and Replace Topsoil, and other miscellaneous site grading work. b. Approximately 1,810 LF of 8 PVC Sanitary Sewer, and 15 services c. Approximately 2,500 LF of 8 PVC Watermain, and 14 services d. Approximately 850 LF of Storm Sewer (18 to 30) and 10 Drop Inlets e. Approximately 2,000 LF of street construction consisting of approximately 6,300 tons of base course, 2,480 tons of asphalt, 6,200 LF of curb and gutter, and 2,940 SF of 4 Concrete Sidewalk. f. Other Miscellaneous Work described in the Drawings. Schedule B a. Approximately 1,180 LF of 8 PVC Sanitary Sewer, and 31 services b. Approximately 2,145 LF of 8 PVC Watermain, and 31 services c. Approximately 490 LF of Storm Sewer (12 to 18) , 5 Drop Inlets, and 1 Area Inlet d. Approximately 2,650 LF of street construction consisting of approximately 4,250 tons of base course, 1,600 tons of asphalt, 5,025 LF of curb and gutter, and 17,380 SF of 4 Concrete Sidewalk.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents