Similar Projects
Salem Street Wellfield Replacement Project Pumping Station
New Construction, Infrastructure
Bidding
Wilmington, MA 01887

Salem Street Wellfield Replacement Project Pumping Station - Sub Bid
New Construction, Infrastructure
Sub-Bidding
Wilmington, MA 01887

Well No. 3 Upgrades - General Bids
Post-Bid
Less than $750,000 est. value
Littleton, MA

Well Cleaning 2 and 8 Redevelopment
Post-Bid
Sudbury, MA

Heather Row Grinder Pump (Furnish and Install)
Results
$225,000 est. value
Tewksbury, MA

Replacement/Installation of Two (2) High Lift Pumps
Results
Natick, MA 01760

Sewer Pump Station On-Call Repair & Maintenance
Post-Bid
Less than $67,300 est. value
Burlington, MA

Replacement of Evergreen Well 3
Results
Natick, MA 01760

Cleaning and Redeveloping of Chestnut Well 3 and Cranberry Well
Post-Bid
Hudson, MA

Morse Pond Replacement Well Field
Results
$198,462 est. value
Natick, MA

Two Irrigation Wells at 115 Cochituate Road and 317 Hollis Street
Post-Bid
Framingham, MA 01701

Spectacle Pond Well 1 Replacement
Results
Less than $200,000 est. value
Ayer, MA

Private Sector Sump Pump Removal and Sewer System Rehabilitation
Post-Bid
Belmont, MA

Mill Road Well 1 Replacement
Results
Less than $80,000 est. value
Chelmsford, MA 01824

Furnish and Deliver Residential Grinder Pump Systems
Post-Bid
Ayer, MA

Last Updated 07/14/2021 08:44 AM
Project Title

Disconnection and Relocation of Sump Pumps

Physical Address View project details and contacts
City, State (County) Belmont, MA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,348,169
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes disconnection and relocation of sump pumps from the sewer to the drain and plumbing within buildings, lining of 6-inch through 24-inch VCP sewers, service lateral replacements, point repairs, new manholes, and appurtenant work. Bidders are responsible for assessing the conditions at all of the areas in which the work will take place prior to bidding the project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents